FIELD: oil production industry, particularly plugging compositions for lost-circulation zone isolation during well drilling in salt karst areas or in areas between salt layers hydrodynamically connected one to another.
SUBSTANCE: plugging composition comprises gypsum binding material, magnesium chloride, magnesite caustic powder and water. Above components are taken in the following amounts (% by weight): gypsum binding material - 46.64-56.27, magnesium chloride - 9.15-11.92, magnesite caustic powder - 2.90-10.35, remainder is water.
EFFECT: increased initial time of plugging composition hardening and setting and reduced hardening and setting time of plugging composition mixed with formation water, increased strength of cement stone strength and improved adhesion thereof to salt-bearing rock.
2 ex, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
BACKFILL COMPOSITION FOR PROCESS LIQUID THIEF ZONES ISOLATION IN WELL BORING | 2007 |
|
RU2337123C1 |
MAGNESIA PLUGGING MATERIAL | 2008 |
|
RU2374293C1 |
BACKFILLING MATERIAL | 2008 |
|
RU2366682C1 |
PLUGGING MATERIAL FOR INFLOW SHUTOFF AND LIMITATION TO OIL AND GAS WELLS | 2014 |
|
RU2574433C1 |
PLUGGING COMPOSITION | 0 |
|
SU1456538A1 |
MAGNESIAN GROUTING MATERIAL | 2017 |
|
RU2681163C2 |
PLUGGING MATERIAL AND A METHOD FOR PREPARATION THEREOF | 2006 |
|
RU2295554C1 |
MAGNESIA PLUGGING MATERIAL AND METHOD FOR ITS PRODUCTION | 2014 |
|
RU2542028C1 |
CROSS-LINKING BACKFILL MATERIAL FOR ISOLATION OF HIGH-INTENSITY ABSORPTION INTERVALS | 2024 |
|
RU2826401C1 |
GROUTING COMPOSITION FOR ISOLATION OF LOST-CIRCULATION ZONES AND A METHOD FOR PREPARATION THEREOF | 2005 |
|
RU2293100C1 |
Authors
Dates
2006-04-10—Published
2004-10-14—Filed