FIELD: mining, particularly to protect building structure built of clay ground against flooding in the case of bedded mineral deposit mining under the structure.
SUBSTANCE: method involves cutting dewatering wells in maximal ground subsidence zones over breakage heading center; drilling horizontal drainage wells from dewatering wells at depth, which is less than distance to neutral line at ground layer bent, but is greater than structure foundation erection depth. Well lengths are determined from mathematical expression with taking into consideration parameters of layer cutting and ground shifting process characteristics.
EFFECT: increased clay ground dewatering and structure protection against flooding.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR REDUCING ADVERSE EFFECT OF UNDERGROUND WORKINGS ON GROUND SURFACE | 1991 |
|
RU2014396C1 |
METHOD OF MAKING ARTIFICIAL WATER BASIN ON COAL-BEARING AREA | 0 |
|
SU1710747A1 |
METHOD OF MONITORING THE DEVELOPMENT OF A ZONE OF WATER-CONDUCTING CRACKS OVER A MINED SPACE ON RESERVOIR DEPOSITS | 2018 |
|
RU2687817C1 |
METHOD FOR GROUND WATER DRAINING AND SURFACE WATER ACCUMULATION IN TERRITORY TO BE UNDERWORKED | 2004 |
|
RU2278208C1 |
METHOD FOR GROUND SURFACE PROTECTION AGAINST UNDERFLOODING DURING UNDERWORKING OPERATION PERFORMING | 2004 |
|
RU2271448C1 |
METHOD OF PROTECTION OF UNDERWORKED OBJECTS FROM UNDERFLOODING WITH GROUND AND SURFACE WATERS | 0 |
|
SU1700243A1 |
METHOD TO DETERMINE DEFORMATION OF EARTH SURFACE IN ABSENCE OF MUTUAL VISIBILITY BETWEEN OBSERVED STATIONS | 2013 |
|
RU2569076C2 |
METHOD OF ROOF CONTROL IN FLAT POTASSIUM SEAMS | 1994 |
|
RU2074960C1 |
METHOD OF PROTECTING CHIPPED-AWAY STRUCTURES | 0 |
|
SU1774995A3 |
METHOD OF MINING FLAT SEAMS AT ROOF CONTROL ON BAND PILLARS | 1994 |
|
RU2074959C1 |
Authors
Dates
2006-05-10—Published
2004-12-22—Filed