FIELD: mining.
SUBSTANCE: load-carrying flooring is built under thickness of dangerous rocks. Flooring has the type of grid consisting of series of wells drilled from lower wall to side wall of series of steep ore bodies inside which pre-stressed ropes are arranged. After tension of ropes, their ends are fixed on surface of walls of minings by means of pipes having L-shaped cutout. Wells are filled with curing mixtures. Development of deposits is performed after erection of flooring.
EFFECT: higher development safety of series of thin steep ore deposits.
2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNDERGROUND MINING OF MASSIVE STEEP ORE DEPOSITS | 2009 |
|
RU2411360C1 |
DEVELOPMENT METHOD OF ORE DEPOSITS WITH BLOCK CAVING SYSTEM WITH ACTIVE FLEXIBLE SEPARATING COVERING | 2009 |
|
RU2426881C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF STEEPING ORE BODIES IN DESCENTING ORDER WITH CHAMBER SYSTEM | 2022 |
|
RU2790648C1 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
METHOD OF UNDERGROUND MINING OF STEEP FIELD OF FIRM MINERAL | 2007 |
|
RU2334875C1 |
THICK FLAT DIPPING ORE DEPOSITS AT BIG DEPTHS DEVELOPMENT METHOD | 2015 |
|
RU2607131C1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD FOR MINING INCLINED AND STEEPLY DIPPING ORE BODIES OF MEDIUM THICKNESS | 2022 |
|
RU2796992C1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU907256A1 |
Authors
Dates
2011-07-27—Published
2009-12-28—Filed