FIELD: oil and gas industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: method involves temporarily isolating productive bed within low filtration resistance interval by cement bridge forming along with cement forcing in productive formation, wherein cement volume is determined from productive formation thickness, lengths of perforation holes in productive formation and width of cracks created by hydraulic fracturing operation; eliminating water influx from water-bearing seam of underlaying productive formation; perforating impermeable layer, which separates water-bearing seam and productive formation; injecting cement mortar with expansion agent through perforation orifices formed in the layer; drilling cement bridge and creating low filtration resistance channels between productive formation and well by performing repeated productive formation perforation.
EFFECT: increased efficiency and quality.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ISOLATION OF BEDS WITH WATER FLOWS | 2000 |
|
RU2191886C2 |
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION | 2019 |
|
RU2740986C1 |
METHOD OF PRODUCTIVITY RECOVERY AND COMMISSIONING OF NON-OPERATING OIL AND GAS WELLS | 2013 |
|
RU2536515C1 |
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT | 2003 |
|
RU2272894C2 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
PROCEDURE FOR DEVELOPMENT OF WATER-FLOODED OIL DEPOSITS | 2010 |
|
RU2420657C1 |
HYDRAULIC FRACTURING METHOD FOR LOW-PERMEABLE FORMATION WITH IMPERMEABLE LAYER AND WATER-BEARING INTERLAYER | 2014 |
|
RU2550638C1 |
METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT | 2012 |
|
RU2504650C1 |
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 |
|
RU2584256C1 |
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT | 2012 |
|
RU2509885C1 |
Authors
Dates
2006-06-20—Published
2004-04-29—Filed