METHOD FOR REMEDIAL CEMENTING WORKS PERFORMING AFTER HYDRAULIC FORMATION FRACTURING Russian patent published in 2006 - IPC E21B33/13 

Abstract RU 2278243 C2

FIELD: oil and gas industry, particularly methods or devices for cementing, for plugging holes, crevices, or the like.

SUBSTANCE: method involves temporarily isolating productive bed within low filtration resistance interval by cement bridge forming along with cement forcing in productive formation, wherein cement volume is determined from productive formation thickness, lengths of perforation holes in productive formation and width of cracks created by hydraulic fracturing operation; eliminating water influx from water-bearing seam of underlaying productive formation; perforating impermeable layer, which separates water-bearing seam and productive formation; injecting cement mortar with expansion agent through perforation orifices formed in the layer; drilling cement bridge and creating low filtration resistance channels between productive formation and well by performing repeated productive formation perforation.

EFFECT: increased efficiency and quality.

1 dwg

Similar patents RU2278243C2

Title Year Author Number
METHOD OF ISOLATION OF BEDS WITH WATER FLOWS 2000
RU2191886C2
METHOD OF RESTORATION OF WATER-FLOODED GAS OR GAS CONDENSATE WELL AFTER HYDRAULIC FRACTURING OF FORMATION 2019
  • Sarkarov Ramidin Akberbubaevich
  • Seleznev Vyacheslav Vasilevich
  • Radzhabova Alina Ramidinovna
RU2740986C1
METHOD OF PRODUCTIVITY RECOVERY AND COMMISSIONING OF NON-OPERATING OIL AND GAS WELLS 2013
  • Kuzjaev Ehl'Mir Sattarovich
RU2536515C1
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT 2003
  • Kopytov Grigorij Mikhajlovich
  • Kopytov Andrej Grigor'Evich
RU2272894C2
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL 2019
  • Klimov Vyacheslav Vasilevich
  • Arestenko Yurij Pavlovich
  • Burkova Anastasiya Alekseevna
RU2723416C1
PROCEDURE FOR DEVELOPMENT OF WATER-FLOODED OIL DEPOSITS 2010
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Gazizov Il'Gam Garifzjanovich
  • Zijatdinov Radik Zjauzjatovich
  • Jakhina Ol'Ga Aleksandrovna
  • Sulejmanov Farid Bashirovich
RU2420657C1
HYDRAULIC FRACTURING METHOD FOR LOW-PERMEABLE FORMATION WITH IMPERMEABLE LAYER AND WATER-BEARING INTERLAYER 2014
  • Makhmutov Il'Gizar Khasimovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
  • Girfanov Il'Dar Il'Jasovich
  • Mansurov Ajdar Ul'Fatovich
RU2550638C1
METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2504650C1
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER 2015
  • Salikhov Mirsaev Mirgazjamovich
  • Galiev Ajdar Bulatisovich
RU2584256C1
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2509885C1

RU 2 278 243 C2

Authors

Kopytov Grigorij Mikhajlovich

Kopytov Andrej Grigor'Evich

Kopytov Aleksandr Grigor'Evich

Dates

2006-06-20Published

2004-04-29Filed