METHOD OF DEVELOPMENT OF FLOODED OIL DEPOSIT Russian patent published in 2014 - IPC E21B43/32 E21B33/13 

Abstract RU 2504650 C1

FIELD: oil-and-gas industry.

SUBSTANCE: casing is sunk into well to perforate the bed. Oil and water saturation intervals and impermeable seam sizes are analysed. Casing part is cut out to expand the borehole in said interval. Fluid is injected in string for packer to define the bed specific capacity. Fluid circulation is defined by injecting fluid via casing string-borehole annulus. In case circulation exists, isolation composition is injected to produce isolation bridge inside casing string 20-30 m above perforation interval. In case circulation does not exist, isolation composition is discharged via casing string-borehole annulus to interval of perforation of oil-and water saturated bed zone to fill expanded bore expanded interval with isolation composition. After hardening of isolation composition, isolation composition is drilled to produce the shield opposite said saturated zone. Isolation quality is analysed. Bed perforation is repeated to resume its development.

EFFECT: lower labour input, accelerated process, higher isolation quality.

7 dwg

Similar patents RU2504650C1

Title Year Author Number
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2494247C1
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2509884C1
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2509885C1
INSULATION METHOD FOR BEHIND-THE-CASING FLOWS IN WELL 2019
  • Rakhmaev Lenar Gambarovich
RU2713279C1
DEVELOPMENT OF FLOODED OIL DEPOSIT 2014
  • Fajzullin Ilfat Nagimovich
  • Nabiullin Rustem Fakhrasovich
  • Gusmanov Ajnur Rafkatovich
  • Gubaev Rim Salikhovich
  • Sadykov Rustem Il'Darovich
RU2570156C1
DEVELOPMENT METHOD OF WATER-FLOODED OIL DEPOSIT 2012
  • Makhmutov Il'Gizar Khasimovich
  • Kadyrov Ramzis Rakhimovich
  • Zijatdinov Radik Zjauzjatovich
  • Zhirkeev Aleksandr Sergeevich
  • Sulejmanov Farid Bashirovich
RU2495996C1
PROCEDURE FOR DEVELOPMENT OF WATER-FLOODED OIL DEPOSITS 2010
  • Fajzullin Ilfat Nagimovich
  • Ramazanov Rashit Gaznavievich
  • Gazizov Il'Gam Garifzjanovich
  • Zijatdinov Radik Zjauzjatovich
  • Jakhina Ol'Ga Aleksandrovna
  • Sulejmanov Farid Bashirovich
RU2420657C1
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER 2015
  • Salikhov Mirsaev Mirgazjamovich
  • Galiev Ajdar Bulatisovich
RU2584256C1
METHOD FOR ISOLATING BEHIND-THE-CASING FLOWS IN A WELL WITH A WATER-AND-OIL-SWELLABLE PACKER 2021
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
RU2772032C1
METHOD FOR CARRYING OUT WATER SHUTOFF TREATMENT IN WELL 2016
  • Salikhov Mirsaev Mirgazyamovich
  • Mukhliev Ilnur Rashitovich
  • Sagidullin Lenar Rafisovich
RU2622965C1

RU 2 504 650 C1

Authors

Makhmutov Il'Gizar Khasimovich

Kadyrov Ramzis Rakhimovich

Zijatdinov Radik Zjauzjatovich

Zhirkeev Aleksandr Sergeevich

Sulejmanov Farid Bashirovich

Dates

2014-01-20Published

2012-07-27Filed