FIELD: agriculture and forestry; phytoreclamation of descertificated lands.
SUBSTANCE: according to proposed method, first groove is made for seeds in surface zone. Then seeds are sown in groove. Then seeds are covered by pressing into soil and moisture accumulating cavities are formed. Each groove for seeds has form of scalene pyramid with its vertex pointed downwards. Grooves are arranged on surface of desertificated plot in staggered order. Moisture accumulating cavities in form of interrupted furrows are made at side of strip with grooves made for seed sowing. Depth of interrupted furrows is 2-5 time greater than depth of grooves for seeds.
EFFECT: provision of steady phytocoenoses on desertificated lands by means of grass and shrubs fully acclimatized for specific conditions (such as wheat grass, Kochia, winterfat and others).
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SOWING OF GRASS AND BUSHING SEEDS TO CREATE PASTURES ON DESERT LAND AND CULTIVATION TOOL FOR CONDUCTING THE SAME | 2004 |
|
RU2274986C1 |
METHOD FOR SOWING OF GRASS AND SHRUB SEEDS ON DESERTIFIED SOIL | 2003 |
|
RU2229784C1 |
METHOD FOR SOWING OF GRASS AND SHRUB SEEDS FOR CREATING OF PASTURES | 2002 |
|
RU2229783C1 |
METHOD FOR PLANT SEED SOWING ON ARID PASTURES | 2002 |
|
RU2216899C1 |
METHOD FOR CREATING OF ARTIFICIAL SHRUB-AND-CEREAL PASTURES | 2005 |
|
RU2305390C2 |
SOWING UNIT | 2003 |
|
RU2245608C1 |
METHOD FOR PHYTOMELIORATIVE RECOVERY OF STRONGLY TRAMPLED DOWN AND DEGRADED GRASSLAND | 2016 |
|
RU2634435C2 |
COMBINED SEEDING UNIT | 2002 |
|
RU2226324C1 |
COMBINED SEEDING UNIT | 2003 |
|
RU2245607C1 |
COMBINED SOWING UNIT | 2004 |
|
RU2268564C1 |
Authors
Dates
2006-07-27—Published
2004-07-19—Filed