FIELD: oil production, particularly enhanced recovery methods for obtaining hydrocarbons.
SUBSTANCE: method involves applying vibration action to well bottom zone from day surface and to casing pipes used as waveguide. One or several vibroexciters are installed under the casing pipes so that vibroexciter heads directly face casing pipe. The vibrations are excited by applying action to outer surface of overground casing pipe section through acoustically coherent unloading panel. Vibration action frequency is selected so that casing pipe length is equal to multiple half wave lengths. Casing pipe perforation zone is in wave crest area. Vibration action frequency is primarily estimated from analytic formula.
EFFECT: increased oil output and reduced water content in produced oil.
4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CEMENTING OIL AND GAS WELLS AND DEVICE FOR REALIZATION OF SAID METHOD | 2005 |
|
RU2291948C1 |
METHOD AND DEVICE FOR OIL RECOVERY INCREASE | 2006 |
|
RU2312980C1 |
METHOD OF INCREASING OIL WITHDRAWAL AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2353760C1 |
METHOD OF DEVELOPMENT OF DROWNED OIL DEPOSIT AND DEVICE FOR VIBROSEISMIC TREATMENT OF THIS DEPOSIT | 1999 |
|
RU2172819C1 |
SIMULATION METHOD OF OIL EXTRACTION FROM OIL WELL | 2011 |
|
RU2479712C2 |
PROCESS OF EXPLOITATION OF FLOODED OIL FIELD AND GEAR FOR ITS IMPLEMENTATION | 1999 |
|
RU2163660C1 |
OIL RECOVERY INTENSIFICATION METHOD AND NON-OPERATING OIL WELLS RECOVERY USING RESERVOIR ELECTROMAGNETIC RESONANT TREATMENT | 2008 |
|
RU2379489C1 |
DEVICE OF VIBROSEIS IMPACT ON OIL-AND-GAS DEPOSIT | 2009 |
|
RU2410524C2 |
METHOD FOR OIL PRODUCTION AT THE LATER STAGE OF OIL DEPOSIT HAVING WATER BED DEVELOPMENT | 2005 |
|
RU2299977C2 |
DEVELOPMENT METHOD OF OIL FIELD WITH WATER-OIL ZONES | 2009 |
|
RU2386795C1 |
Authors
Dates
2006-08-20—Published
2004-07-06—Filed