FIELD: mechanical engineering; materials handling facilities.
SUBSTANCE: invention can be used in safeguards of boom lifting cranes. Proposed method provides for preliminary determination and storing of maximum tolerable value of load moment and determination on current value of moment by two methods in process of crane operation. Each method includes measuring working parameters of crane characterizing current load and current radius with subsequent calculation of current value of load moment. To generate warning signal or crane control signal, memorized maximum tolerable value of load moment is compared either with one of pre-calculated current values of load moment, or with maximum calculated value of two values. Current values of load moment obtained by first and second methods are compared additionally and if they differ crane control signal of formed.
EFFECT: provision of overload protection of load-lifting crane of any type, prevention of crane downtimes caused by frequent failures pf safety system.
16 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
BOOM LOAD-LIFTING CRANE PROTECTION METHOD | 2004 |
|
RU2271332C2 |
METHOD OF INCREASING SAFETY (VERSIONS) AND SAFETY SYSTEM OF JIB HOISTING CRANE (VERSIONS) | 2009 |
|
RU2396201C1 |
LOAD-LIFTING CRANE PROTECTION METHOD | 2004 |
|
RU2271985C2 |
METHOD TO PROTECT LOAD-LIFTING CRANE FROM OVERLOADS | 2004 |
|
RU2276096C2 |
METHOD TO INCREASE SAFETY OF OPERATION OF LOAD-LIFTING CRANE | 2004 |
|
RU2270162C2 |
METHOD OF AND DEVICE FOR PREVENTING EMERGENCIES AT OPERATION OF LOAD-LIFTING CRANE (VERSIONS) | 2006 |
|
RU2306255C1 |
METHOD OF ADJUSTING SAFEGUARD OF LOAD-LIFTING CRANE AND SAFEGUARD USED IN CRANE | 2005 |
|
RU2307061C1 |
METHOD OF SETTING WORKING ZONE OF LOAD-LIFTING CRANE BY CRANE OPERATOR | 2004 |
|
RU2280610C2 |
LOAD-LIFTING CRANE SAFEGUARD ADJUSTMENT METHOD | 2003 |
|
RU2262481C2 |
PROTECTION SYSTEM FOR LIFTING CRANE (VERSIONS) | 2006 |
|
RU2335451C1 |
Authors
Dates
2006-08-27—Published
2005-03-28—Filed