FIELD: methods of underground mining, particularly for brown or hard coal mining along with goaf filling.
SUBSTANCE: method involves cutting horizontal layers in strips along the strike by mechanical hydraulic breaking thereof along with rock mass transportation and cuts filling with poured hardening filler, wherein holes for following combined filler supply into goaf are left in the cuts. The seam is cut in strips in descending order so that drifts and chambers are left in underlaying strips. Next strip is cut by hydraulic monitor. Rock from hopper is moved by conveyer out of flexible roof into goaf and impregnated with poured hardening filler during preparation mine filling.
EFFECT: reduced labor inputs and increased safety.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTION OF THIN AND AVERAGELY THICK STEEP FORMATIONS OF MINERAL RESOURCE WITH BACKFILL OF EXTRACTED SPACE | 2005 |
|
RU2293182C1 |
PROCEDURE FOR DEVELOPMENT OF STEEPLY PITCHING BEDS OF COAL | 2009 |
|
RU2390633C1 |
DEVELOPING METHOD OF HEAVY ABRUPT LAYER WITH CAST SOLID STOWING | 2008 |
|
RU2364722C1 |
METHOD OF MINING THICK STEEP COAL SEAMS | 0 |
|
SU1751336A1 |
METHOD OF MINING A THICK STEEP MINERAL BED WITH GOAF-FILLING | 0 |
|
SU1472673A1 |
FOR DEVELOPING STEEP DEPOSITS BY HYDRAULIC GIANT | 0 |
|
SU1737119A1 |
METHOD OF UNDER-LEVEL PLASTS' DEVELOPMENT PROCESSING WITH THE BINDING OF THE ESTABLISHED SPACE | 2017 |
|
RU2644185C1 |
METHOD FOR RILL CUT MINING OF THICK STEEPLY DIPPING BEDS WITH FILLING | 1993 |
|
RU2069748C1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD OF MINING SLOPING COAL SEAMS | 0 |
|
SU781351A1 |
Authors
Dates
2006-09-10—Published
2005-04-28—Filed