FIELD: mining engineering.
SUBSTANCE: invention relates to mining industry and can be used at underground operation heavy abrupt layer with stowing of open area. Method includes implementation of layerwise drifts, upraise and alternate development of cut in horizontal fibers by means of combine and following filling of cuts by cast solid stowing. Before stowing supplying, on cut soil there are laid chutes and are installed shields for reservation as operating layerwise drift in waste horizontal fibers. Layerwise drifts are implemented up to beginning of layer development nearby top or nearby layer soil and they are used for coal transportation, ventilation and feeding of cast solid stowing into cuts of underlying horizontal layer.
EFFECT: increase of labour productivity and safety of mining.
8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR THICK STEEP MINERAL SEAM MINING ALONG WITH GOAF FILLING | 2005 |
|
RU2283431C1 |
METHOD FOR MINING THICK STEEPLY INCLINED AND STEEP COAL BEDS | 2009 |
|
RU2398966C1 |
METHOD OF WORKING THICK SLOAPING COAL SEAMS BY ASCENDING HORIZONTAL LAYERS | 0 |
|
SU866194A1 |
METHOD OF HYDRAULIC MINING OF STEEP THICK SEAMS WITH SOLID HARDENING GOBBING | 1993 |
|
RU2084631C1 |
METHOD FOR EXTRACTION OF THIN AND AVERAGELY THICK STEEP FORMATIONS OF MINERAL RESOURCE WITH BACKFILL OF EXTRACTED SPACE | 2005 |
|
RU2293182C1 |
METHOD FOR EXTRACTING MASSIVE SLOPING COAL BED BY HORIZONTAL DESCENDING LAYERS WITH FULL FILLING OF EXTRACTED SPACE | 2002 |
|
RU2233983C1 |
METHOD FOR MINING THICK STEEPLY DIPPING SEAMS BY HYDRAULIC BREAKING WITH CAST SELF-CEMENTING FILL | 1993 |
|
RU2069752C1 |
METHOD FOR MINING OF THICK STEEP FIRE-HAZARDOUS COAL SEAMS | 1991 |
|
RU2011823C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD FOR ROOF CONTROL IN MINING COAL SEAMS | 1992 |
|
RU2067174C1 |
Authors
Dates
2009-08-20—Published
2008-04-16—Filed