FIELD: land-surveying for industrial, civil and hydraulic building, particularly artificial horizons.
SUBSTANCE: method involves installing reference means and marks; performing engineering-geological works to determine ground sliding surface of active (sliding) slope part; exploring active slope part along slope cross-section; driving reinforcement bars used as reference means and marks in active slope part ground; arranging reinforcing bars in direction from slope ridge to active slope part bottom.
EFFECT: increased reliability of active slope part deformation determination.
3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SLOPE RELIABILITY DETERMINATION AND INCREASE | 2005 |
|
RU2295609C2 |
METHOD FOR REINFORCING LANDSLIDE SLOPES WITH PILES | 0 |
|
SU1789593A1 |
METHOD FOR MONITORING SAFETY OF EARTH DAM AND DEVICE FOR ITS IMPLEMENTATION | 2007 |
|
RU2393290C2 |
DEVICE FOR MONITORING SOIL DEFORMATIONS IN CRYOLITE ZONE | 2020 |
|
RU2739288C1 |
METHOD OF CONTROLLING POSITION OF ABOVE-GROUND PIPELINES UNDER PERMAFROST CONDITIONS | 2014 |
|
RU2582428C2 |
METHOD FOR STRENGTHENING OF SLOPES AND SLOT MAKER FOR ITS REALISATION | 2008 |
|
RU2371547C1 |
METHOD TO DETERMINE DEPTH IN LANDSLIP-HAZARDOUS ROOT MASSIF OF POTENTIALLY DEFORMABLE HORIZON | 2009 |
|
RU2412305C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
METHOD OF MEASURING LAYER-WISE DEFORMATION OF SOIL | 0 |
|
SU863758A1 |
HORIZONTAL WELL DRILLING METHOD | 2023 |
|
RU2806206C1 |
Authors
Dates
2006-09-27—Published
2002-10-23—Filed