FIELD: construction.
SUBSTANCE: method for monitoring safety of earth dams includes installation of basic piles and registration of ground displacements. Rope is pulled between piles and is enclosed into brittle lime-cement lining - train, which is tightly joined to surface of dam slope ground. Ground displacements are registered by variation of rope length with the help of light and sound alarm, besides area of ground displacements is determined by cracks that occurred on lining.
EFFECT: invention makes it possible to continuously monitor safety of earth dam faces and to improve accuracy of landslip are detection.
1 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING THE STABILITY OF OPEN PIT SIDES, DUMPS AND CONSTRUCTIONS FROM PERMAFROST | 2018 |
|
RU2684543C1 |
METHOD OF CONTROLLING SPEED OF VEHICLES ON AREAS IN SEVERE NATURAL ENVIRONMENT | 2013 |
|
RU2553395C2 |
DEVICE FOR DETECTION OF DEFORMATIONS OF SOIL MASSIF AND METHOD OF ITS OPERATION | 2012 |
|
RU2484200C1 |
METHOD FOR DETERMINING DEFORMATION OF MINE ROCKS IN ZONES INACCESSIBLE FOR DIRECT MEASUREMENTS | 2012 |
|
RU2509889C1 |
METHOD OF MONITORING HAZARDOUS GEODYNAMIC PROCESSES | 2011 |
|
RU2467287C2 |
DEVICE FOR MONITORING SOIL DEFORMATIONS IN CRYOLITE ZONE | 2020 |
|
RU2739288C1 |
SOIL DIP SENSOR | 2019 |
|
RU2708928C1 |
METHOD OF FOUNDATION REINFORCEMENT | 2009 |
|
RU2410492C1 |
WATERWORKS FACILITY AT WATERWAY OF SEASONAL ACTION UNDER CONDITIONS OF PERMAFROST SOILS | 2010 |
|
RU2424397C1 |
METHOD OF TUNNEL CONSTRUCTION | 2001 |
|
RU2181414C1 |
Authors
Dates
2010-06-27—Published
2007-09-10—Filed