FIELD: oil and gas industry, particularly productive reservoir zone treatment to stimulate fluid inflow into well.
SUBSTANCE: method involves taking rock samples from productive pool zone; simulating compression conditions, which are present in bottomhole reservoir zone at different face structures and different pressure drawdown, in taken samples; determining stresses leading to irreversible rock sample cracking or loosening and to irreversible rock penetration increase; selecting face structure and pressure drawdown corresponding to above stresses; providing pressure drawdown at face, which is not less than that selected on the base of above simulation operation; maintaining above pressure drawdown up to fluid output increase or up to fluid output increase termination; injecting chemical agent in bottomhole reservoir zone; holding the chemical agent in bottomhole reservoir zone to provide chemical reaction and removing reaction products; bringing wells into operation.
EFFECT: increased fluid output from well.
3 cl, 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INJECTION WELL TREATMENT | 2001 |
|
RU2213852C2 |
METHOD OF DIRECTIONAL LOADING OF THE PLAST | 2016 |
|
RU2645684C1 |
METHOD OF WELL REPAIRS | 2001 |
|
RU2188317C1 |
METHOD FOR IMPROVING THE PRODUCTIVITY OF GAS WELLS | 2022 |
|
RU2798147C1 |
TREATMENT METHOD OF BOREHOLE ZONE OF PRODUCTIVE FORMATION | 2019 |
|
RU2717163C1 |
METHOD FOR DYNAMIC BOTTOMHOLE ZONE TREATMENT IN HIGH-TEMPERATURE LOW-PERMEABLE RESERVOIRS | 2006 |
|
RU2322578C2 |
METHOD FOR REACTANT-WAVE TREATMENT OF BOTTOMHOLE FORMATION ZONE WITH FILTRATION PRESSURE WAVES | 2014 |
|
RU2584253C2 |
METHOD FOR STIMULATING THE INFLOW OF GAS WELLS | 2022 |
|
RU2788934C1 |
METHOD AND ARRANGEMENT OF HYDRAM FOR BOTTOMHOLE FORMATION AREA AND WELL DEVELOPMENT | 2013 |
|
RU2534116C1 |
TREATMENT METHOD OF BOREHOLE ZONE OF LOW-PERMEABLE BED AND DEVICE FOR ITS IMPLEMENTATION | 2018 |
|
RU2703093C2 |
Authors
Dates
2006-10-20—Published
2005-04-05—Filed