FIELD: oil industry, possible use while extracting oil deposits using horizontal wells.
SUBSTANCE: in accordance to method, main transport horizontal shaft is drilled horizontally or at an angle to roof part of productive bed. From there additional branched descending shafts are drilled with lowering of their faces towards the end of main transport horizontal shaft. First additional branched descending shaft is drilled in continuation of main transport horizontal shaft and with same diameter. Second and following additional branched descending shafts are drilled from main transport horizontal shaft with gradually decreased diameters. After drilling of each additional branched descending shaft intensification processing of face zone and conservation by viscous-resilient composition are performed for time of drilling of next additional branched descending shafts.
EFFECT: increased oil yield of deposit.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OIL FIELD DEVELOPMENT BY HORIZONTAL WELLS | 2005 |
|
RU2274738C1 |
METHOD FOR OIL POOL DEVELOPMENT WITH HORIZONTAL WELLS | 2005 |
|
RU2283947C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2473794C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTAL WELLS | 2010 |
|
RU2418157C1 |
PROCEDURE FOR DEVELOPMENT OF OIL MASSIVE POOL | 2011 |
|
RU2427708C1 |
DEVELOPMENT METHOD OF OIL DEPOSITS WITH HORIZONTAL WELLS | 2012 |
|
RU2488690C1 |
DEVELOPMENT METHOD OF OIL MASSIVE DEPOSIT AND ADJUSTABLE WELL VALVE | 2010 |
|
RU2443854C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT BY HORIZONTAL BORE-HOLES | 1999 |
|
RU2141560C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2181831C1 |
METHOD OF DEVELOPING OIL POOL USING HORIZONTAL MULTIBRANCH WELLS | 2012 |
|
RU2505668C1 |
Authors
Dates
2006-11-20—Published
2005-12-16—Filed