FIELD: oil producing industry; applicable in development of nonuniform multilayer oil pool. SUBSTANCE: method includes oil withdrawal through producing wells. Horizontal wellbores are drilled from existing wellbores of producing wells into producing formation. Drilling of horizontal wellbores is carried out at distance from existing wellbore of, at least, 200 m. Horizontal wellbore is cased, and casing is perforated in region of producing well. Packers are set between casing string and well bore for separation of water- and oil-bearing formation. Well is operated until water cutting of well production. Packers are set in motion. Casing string is withdrawn. Horizontal well bore is eliminated. New horizontal wellbore is drilled from existing window in existing wellbore at new azimuth angle, and recovery operations are repeated. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2181430C1 |
OIL RESERVOIR AREA DEVELOPMENT | 2004 |
|
RU2263771C1 |
METHOD OF DROWNED OIL POOL DEVELOPMENT | 2000 |
|
RU2173770C1 |
METHOD FOR DEVELOPMENT OF DENSE OIL DEPOSIT BY ELECTRIC FRACTURE | 2020 |
|
RU2733239C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2305758C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT WITH NON-HOMOGENOUS COLLECTOR | 2004 |
|
RU2256070C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT AT LATE STAGE | 2012 |
|
RU2488691C1 |
PROCESS OF EXPLOITATION OF OIL FIELD | 2000 |
|
RU2170340C1 |
DEVELOPMENT METHOD OF POWERFUL LOW-PERMEABILITY OIL DEPOSIT | 2020 |
|
RU2738145C1 |
OIL POOL DEVELOPMENT METHOD | 1994 |
|
RU2047753C1 |
Authors
Dates
2002-04-27—Published
2001-06-13—Filed