FIELD: heat power engineering.
SUBSTANCE: according to proposed method, steam from first three extractions of type T extraction turbine is directed to high-pressure regenerative heaters, and steam from last four extractions, to low-pressure regenerative heaters in which main condensate after turbine condenser and feed water are heated successively. Steam from seventh and sixth extractions of type T turbine is directed for heating system water in lower and upper system heaters, respectively. System water is heated after system heaters in steam-water system heater for air heaters of steam generator by delivering heating medium. Used as such heating medium is steam from fifth extraction of type T turbine with heating steam extractions.
EFFECT: improved economy and reliability of thermal power station owing to use of stable low grade heat source as heating medium in steam-water heater of system water for air heaters of steam generator.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER STATION | 2005 |
|
RU2287704C1 |
THERMAL POWER STATION OPERATING PROCESS | 2005 |
|
RU2293852C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2287702C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2287703C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2287699C1 |
THERMAL POWER STATION | 2005 |
|
RU2293853C1 |
THERMAL POWER STATION | 2005 |
|
RU2287700C1 |
METHOD OD OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2278982C1 |
THERMAL POWER STATION | 2005 |
|
RU2287706C1 |
THERMAL POWER STATION | 2005 |
|
RU2287705C1 |
Authors
Dates
2006-11-20—Published
2005-06-07—Filed