FIELD: heat power engineering.
SUBSTANCE: according to proposed method, steam from first three extractions of type T extraction turbine is directed to high-pressure regenerative heaters, and steam from last four extraction, to low-pressure regenerative heaters in which main condensate after turbine condenser and feed water are heated successively, and steam from seventh and sixth extractions of type T turbine is directed for heating system water in lower and upper system heaters, respectively. Source water for making-up heat supply system is heated before chemical water cleaning by delivering heating medium. Used as said heating medium is steam from fifth extraction of type T turbine with heating steam extractions.
EFFECT: improved economy and reliability of thermal power station owing to use of stable low-grade heat source or heating medium in steam-water heater of source water for making up heat-supply system.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER STATION | 2005 |
|
RU2287706C1 |
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT | 2016 |
|
RU2631961C1 |
METHOD OF WORK OF BINARY STEAM HEAT ELECTROCENTRAL | 2016 |
|
RU2626710C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2287702C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2287701C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2287699C1 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2004 |
|
RU2275509C1 |
THERMAL POWER STATION OPERATING PROCESS | 2005 |
|
RU2293852C1 |
THERMAL POWER STATION | 2005 |
|
RU2287705C1 |
THERMAL POWER STATION | 2005 |
|
RU2287704C1 |
Authors
Dates
2006-11-20—Published
2005-06-07—Filed