FIELD: mining industry, possible use during underground processing of mineral resource deposits with hydraulic backfilling of extracted space.
SUBSTANCE: in accordance to method, perpendicularly to longitudinal axis of mine between collapsed section of mine ceiling rock massif is conserved in form of reverse trapezium. Height of fill of large and small piece parts of cross connection exceeds height of mine. Compensation volume of small piece fill, positioned above the ceiling of mine, is made greater than volume of hollow pocket formed below lesser base of rock shelf.
EFFECT: less drilling required, 1,3-1,5 times decreased consumption of explosives.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DAM ERECTION IN MINE WORKING | 0 |
|
SU1681029A1 |
MINE FILL STOPPING | 0 |
|
SU1758245A1 |
PROCESS OF BREAKDOWN SITE ISOLATION | 2003 |
|
RU2328600C2 |
METHOD FOR DEVELOPMENT OF FLAT DIPPING NARROW VEINS | 2020 |
|
RU2725353C1 |
METHOD OF CUTTING ADJOINING GENTLY-SLOPING BEDS SEPARATED BY LOW-STRENGTH INTERLAY | 0 |
|
SU991052A1 |
METHOD FOR MINING OF THIN GENTLY DIPPING ORE BODIES | 1992 |
|
RU2039265C1 |
METHOD OF PROCUCING A PARTITION IN MINE WORKING | 0 |
|
SU1470981A1 |
METHOD OF MINED-OUT SPACE FILLING | 2015 |
|
RU2603992C1 |
COMBINED METHOD OF HIGH-CAPACITY BIN BORING | 2018 |
|
RU2720040C1 |
METHOD OF DRIVING MINE WORKINGS | 2018 |
|
RU2693806C1 |
Authors
Dates
2006-12-27—Published
2005-07-11—Filed