FIELD: building, particularly methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds.
SUBSTANCE: method involves driving two differing invented profiling members, namely additional and main ones, in ground to create invented profiling unit. Additional invented profiling member is driven in ground along with main one for lesser depth and is used to create outer waterproofing means. Before vibratory additional member removal the member is filled with waterproofing composition. The additional member is removed after main profiling member freeing from ground.
EFFECT: extended technological capabilities and increased efficiency due to creation of solid elongated bearing-and-enveloping structure in ground.
3 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTING BEARING/LIMITING STRUCTURES AND DEVICE FOR REALIZATION OF SAID METHOD | 2003 |
|
RU2248430C2 |
VIBRATORY DEVICE FOR ERECTION OF BEARING-ENCLOSING STRUCTURES IN GROUND | 2003 |
|
RU2235828C1 |
VIBRATION DEVICE FOR ERECTING BEARING-AND-FENCING STRUCTURES IN GROUND | 2000 |
|
RU2173373C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
BUILDING AND CONSTRUCTION ERECTING METHOD, AND DEVICE FOR METHOD'S IMPLEMENTATION | 2007 |
|
RU2369692C2 |
METHOD FOR CONSTRUCTING BRIDGE SUPPORT IN WATER AREA | 2023 |
|
RU2809049C1 |
CORRECTION METHOD OF INCLINATION AND NON-UNIFORM SETTLEMENT OF LARGE HIGH-RISE STRUCTURE AND ITS FOUNDATION | 2010 |
|
RU2436899C1 |
UNDERGROUND FACILITY LINING | 2010 |
|
RU2457332C1 |
MULTI-LAYER HYDRAULIC INSULATION OF UNDERGROUND STRUCTURE (DEVICE BY P.B. YURKEVICH) | 2013 |
|
RU2539456C2 |
METHOD AND APPARATUS FOR CONSTRUCTING UNDERGROUND STRUCTURE | 0 |
|
SU1239339A1 |
Authors
Dates
2007-03-10—Published
2005-07-13—Filed