FIELD: mining industry, possible use during underground extraction of coal formations under complicated conditions.
SUBSTANCE: method includes preparation of extraction field by driving transport and ventilation mines and extraction of formation using soil-shelf face in two layers. Extraction of formation between ventilation and transport mines is performed using column-chambers with leaving of blocks, capable of self-destruction with passage of time. Preparation of extraction field is performed only in upper layer by driving a dividing mine, connecting transport mine to ventilation mine, while extraction of lower layer is performed from the soil of upper layer after driving of aforementioned dividing mine. Extraction of lower layer may be performed by excavating the coal from its face from the soil of upper layer with loading of coal onto transportation means of upper layer. Extraction of face of upper layer may be performed by means of niche-cutting machine or driving combines. Operations including extraction of upper and lower layers may be performed under protection of ceiling reinforced with anchors, which are mounted near the face of upper layer. Ceiling may be reinforced with anchors under protection of mechanized lining sections.
EFFECT: increased efficiency.
6 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO PREPARE AND MINE RESERVES OF MINEFIELDS | 2013 |
|
RU2513607C2 |
METHOD FOR MINING OF THICK STEEPLY DIPPING COAL SEAMS | 1991 |
|
RU2029087C1 |
METHOD OF MINING THICK STEEPLY DIPPING COAL SEAM | 0 |
|
SU1712608A1 |
LAYER DEVELOPMENT METHOD OF THICK STEEPLY INCLINED COAL FORMATION | 2011 |
|
RU2470157C1 |
DEVELOPMENT METHOD OF THICK STEEPLY INCLINED COAL FORMATION IN STRIPS AS TO INCLINATION | 2011 |
|
RU2461713C1 |
DEVELOPMENT OF INCLINED COAL BED | 2013 |
|
RU2515791C2 |
METHOD OF DEVELOPMENT OF THICK STEEP COAL BED IN STRAPS DOWNSTREAM | 2011 |
|
RU2462593C1 |
METHOD TO MINE SLOPING AND INCLINED COAL BEDS OF AVERAGE CAPACITY | 2011 |
|
RU2471990C1 |
OPEN-UNDERGROUND MINING OF COAL SEAMS | 2013 |
|
RU2524709C2 |
EXCAVATION METHOD OF THICK FLAT-LYING COAL SEAM WITH FAST ROOF | 2006 |
|
RU2327037C1 |
Authors
Dates
2007-03-10—Published
2005-06-14—Filed