FIELD: mining industry, possible use when extracting thick formations of mineral resources with heterogeneous hardness.
SUBSTANCE: method includes selecting working level on basis of surveying operations, drilling product wells, washing out and hydro-lifting of weak mineral resources of deposit from working level, collapsing and shrinkage of hard large-piece ores of deposit, collapsing of ceiling of resulting cavities. Working level is selected with consideration of given height of collapsing zone. Chambers and blocks are formed during wash-out of ores, blocks are extracted in accordance to plan of chambers. Shrunk large-piece ores are disintegrated and their hydro-extraction is performed with backfill of extracted space.
EFFECT: increased recovery of mineral resource.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL HYDRO-EXTRACTION OF MINERAL RESOURCES | 2005 |
|
RU2301336C2 |
METHOD FOR RECOVERY OF USEFUL COMPONENTS FROM WATER FORMATIONS THROUGH HOLES | 1990 |
|
RU2026490C1 |
METHOD TO EXTRACT MATERIALS FROM THICK UNDERGROUND FORMATIONS | 2010 |
|
RU2447287C1 |
METHOD FOR MINING OF MINERAL FORMATION | 1992 |
|
RU2039278C1 |
METHOD OF BORE-HOLE HYDRAULIC MINING OF MINERALS | 1995 |
|
RU2081325C1 |
METHOD FOR DEVELOPMENT OF STRATA DEPOSITS OF MINERALS | 1996 |
|
RU2102592C1 |
METHOD FOR DEVELOPING DEEP-SEATED MINERAL DEPOSITS | 2002 |
|
RU2235206C1 |
METHOD OF MINERAL HYDRAULIC BOREHOLE MINING | 1996 |
|
RU2101506C1 |
HYDRAULIC BOREHOLE MINING METHOD | 2004 |
|
RU2272141C1 |
METHOD FOR HYDRAULIC BORE-HOLE MINING OF MINERALS | 1995 |
|
RU2081324C1 |
Authors
Dates
2007-03-10—Published
2005-08-10—Filed