METHOD TO PREVENT CASING PIPE CRUSHING IN WELL DRILLED IN PERMAFROST ZONE Russian patent published in 2007 - IPC E21B36/00 

Abstract RU 2299311 C2

FIELD: oil and gas production industry, particularly to construct and operate all types of oil, gas and injection wells in permafrost areas.

SUBSTANCE: method involves forming artificial hollow drain channel in proximity to casing pipe wall so that the drain channel extends along casing pipe wall and is located at depth of permafrost ground sitting to discharge excessive water from cavern via he channel. The hollow drain channel is made as non-filtering pipe string filled with water-immiscible frost-resisting liquid having density exceeding that of cavern water. Bottom part of drain channel is provided with check valve, seating socket for valve receiving and with filter, for instance with the use of wireline technique. Excessive water discharge from cavern may be repeatedly carried out without any limit and without power inputs up to full cavern freezing. To prevent ice plug formation in drain channel the channel and water-immiscible frost-resisting liquid column is exposed to ultrasonic action.

EFFECT: decreased costs of method realization due to power source elimination, reduced power inputs and technical means to maintain drain channel in thawed condition.

2 cl, 1 dwg

Similar patents RU2299311C2

Title Year Author Number
METHOD PREVENTING CASING COLLAPSE IN WELL IN ZONE OF ROCKS FROZEN FOR MANY YEARS 2000
  • Bekmetov A.M.
RU2203392C2
METHOD FOR PREVENTION OF COLLAPSE OF CASING STRING DURING PROLONGED WELL SHUT-DOWN IN ZONE OF PERMAFROST ROCKS 1992
  • Batalov D.M.
  • Shcherbich N.E.
  • Machulis T.A.
RU2039867C1
METHOD OF PREVENTING CRUMPING OF CASING IN PERMOFROST ROCKS 0
  • Malevanskij Vladimir Dmitrievich
  • Smirnov Vladimir Sergeevich
  • Stryukov Anatolij Yakovlevich
  • Glebovskij Anatolij Mikhajlovich
  • Shcherbich Nikolaj Efimovich
SU857445A1
CASING METHOD FOR PERENNIALLY FROZEN ROCK INTERVALS 0
  • Mukhin Leonid Kuzmich
  • Solovev Vladimir Mikhajlovich
  • Efimov Nikolaj Nikolaevich
  • Ivchenko Yurij Timofeevich
  • Kalugin Yurij Nikolaevich
  • Klyusov Anatolij Aleksandrovich
SU1698423A1
METHOD TO PREVENT CASING PIPE CRUSHING INSIDE WELL DRILLED IN PERMAFROST ROCK 2006
  • Kalashnikov Anton Vladimirovich
  • Gubajdullin Marsel' Galliulovich
  • Konjukhov Dmitrij Aleksandrovich
  • Korobov Stanislav Vladimirovich
RU2323326C1
METHOD TO PREVENT CRUSHING OF CASING STRINGS AT SECONDARY FREEZING IN MULTIYEARFROZEN ROCKS 0
  • Blinov Boris Mikhajlovich
  • Medvedskij Rodion Ivanovich
  • Shcherbich Nikolaj Efimovich
  • Baranov Boris Aleksandrovich
  • Batalov Dmitrij Mikhajlovich
SU1629492A2
ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR 2009
  • Dmitruk Vladimir Vladimirovich
  • Rakhimov Nikolaj Vasil'Evich
  • Kustyshev Igor' Aleksandrovich
  • Khozjainov Vladimir Nikolaevich
  • Tkachenko Ruslan Vladimirovich
  • Fedoseev Andrej Petrovich
  • Kustyshev Denis Aleksandrovich
  • Zhuravlev Valerij Vladimirovich
  • Leont'Ev Dmitrij Sergeevich
  • Kustyshev Aleksandr Vasil'Evich
RU2418152C1
METHOD OF SECONDARY OPENING OF PRODUCING FORMATION 1999
  • Bekmetov A.M.
RU2163291C2
METHOD OF PREVENTING COLLAPSE OF CASING IN PERMAFROST ROCK ZONE 0
  • Entov Vladimir Mordukhovich
  • Maksimov Aleksej Mikhajlovich
SU1033713A1
PROCESS OF OPERATION OF FLOODED OIL WELLS AND GEAR FOR ITS IMPLEMENTATION 2001
  • Bekmetov A.M.
  • Shalamov M.I.
RU2217577C2

RU 2 299 311 C2

Authors

Bekmetov Aleksandr Matjakubovich

Fomchenkov Valerij Valer'Evich

Dates

2007-05-20Published

2004-02-16Filed