FIELD: oil and gas production, particularly for metered corrosion inhibitor, paraffin and salt accumulation inhibitor, as well as demulsifying agent injection in oil well.
SUBSTANCE: method involves performing periodic regent supply in hole annuity of well with the use of proportioning pump. In the case of underground repair of sticky well supply cable of centrifugal pump electric motor is substituted for cable with capillary pipe. The cable with capillary pipe is connected to flow string and is lowered in well. Chemical reagent is injected in well via the capillary pipe to downhole pump inlet or within perforation interval of the well. To provide chemical reagent supply capillary pipe end is connected with polyethylene capillary pipe having design length with the use of connection nipple provided with weighting jet.
EFFECT: provision of guaranteed reagent supply to pump inlet or within well perforation interval, possibility to change class of reagent to be supplied in well and amount of reagent in dependence of well operation parameters.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REAGENT SUPPLY AND WELL TREATMENT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2593850C1 |
METHOD FOR CHEMICAL PROTECTION OF DOWNHOLE EQUIPMENT AGAINST CORROSION, PARAFFIN AND SALT DEPOSITS AND AGAINST SULFATE-REDUCING BACTERIA | 2004 |
|
RU2260677C1 |
DEVICE FOR SUPPLYING REAGENT TO WELL | 2023 |
|
RU2808108C1 |
HIGH-VISCOSITY OIL WELL DEVELOPMENT METHOD | 2016 |
|
RU2620692C1 |
METHOD OF HIGH-VISCOSITY OIL WELL DEVELOPMENT AND OPERATION | 2014 |
|
RU2550636C1 |
DEVICE FOR DOSED REAGENT SUPPLY TO WELL | 2013 |
|
RU2531014C1 |
DEVICE FOR PROPORTIONED DELIVERY OF REAGENT INTO OIL PRODUCING WELL | 1997 |
|
RU2127799C1 |
DEVICE FOR REAGENT PROPORTIONING INTO OIL PRODUCING WELL | 1999 |
|
RU2168613C2 |
METHOD FOR EVEN SUPPLY OF LIQUID REAGENT INTO WELL | 2009 |
|
RU2398098C1 |
DEVICE FOR HIGH-PARAFFIN CRUDE OIL PRODUCTION | 2014 |
|
RU2560024C1 |
Authors
Dates
2007-07-10—Published
2004-05-17—Filed