FIELD: mining, particularly transport specially adapted to underground conditions.
SUBSTANCE: method involves loading industrial waste in tilting skip unloaded from skip bottom; receiving and unloading industrial waste via hoppers; lowering empty skip at predetermined depth for skip loading with industrial waste from another hopper; transporting skip filled with industrial waste along bore to receiving hopper opened by means of hinges; unloading industrial waste through bottom thereof; filling the skip with mineral; lifting the skip to day surface along the bore.
EFFECT: increased efficiency of skip hoist usage for industrial waste lowering and transportation to goaf.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING SUBWAY STRUCTURES | 0 |
|
SU1747610A1 |
LIFTING SKIP UNIT | 0 |
|
SU1579451A3 |
METHOD FOR MOVEMENT AND LOADING OF MINED MASS OF UNDERGROUND BUNKER COMPLEX | 0 |
|
SU1666737A1 |
MINE HOISTING PLANT SKIP | 2022 |
|
RU2813869C1 |
METHOD FOR TRANSPORTING ROCK MASS FROM QUARRIES AND MINES | 1997 |
|
RU2136883C1 |
PROFESSOR KARIMAN METHOD FOR UNDERGROUND EXTRACTION OF MINERALS BY LARGE BLOCKS | 2011 |
|
RU2459078C1 |
METHOD FOR UNCOVERING AND PREPARING ORE ZONES AND LIFTING-TRANSPORT PLANT FOR THIS METHOD | 2005 |
|
RU2346157C2 |
PNEUMATIC LIFT | 1992 |
|
RU2081327C1 |
METHOD FOR KIMBERLITE PIPE DEVELOPMENT UNDER DIFFICULT HYDROGEOLOGICAL CONDITIONS | 2001 |
|
RU2258810C2 |
MAIN SHAFT HOIST | 1990 |
|
RU2025441C1 |
Authors
Dates
2007-07-20—Published
2006-01-31—Filed