FIELD: mining industry, particularly underground gently dipping ore deposit development.
SUBSTANCE: method involves creating preparatory-development workings; forming chambers and pillars in pairs within uncontrolled leading rock caving pitch; cutting ore in chamber; drawing main portion of cut ore under rock ledge protection so that ore slope is created; performing forced rock caving over chamber along with simultaneous roof rock block excavation over pillar; cutting the ore pillar and drawing remainder ore under caved rock and descending roof block. Chambers are cut by chamber length increase in direction transversal to second working front in several layers. Layer thickness is determined from mathematical expression. Then cut ore is drawn in end direction under rock peak protection.
EFFECT: increased ore cutting efficiency due to decreased losses and ore dilution, increased operational safety.
4 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MINING OF MINERAL DEPOSITS | 1995 |
|
RU2099527C1 |
METHOD OF DEVELOPMENT OF INCLINED ORE DEPOSITS IN RANGE OF BEDDING ANGLES 15-35 DEGREES AND THICKNESS OF ORE BODIES 15-30 METERS WITH CAVING OF ORE AND SURROUNDING ROCKS | 2014 |
|
RU2563857C1 |
METHOD FOR THICK ORE DEPOSIT DEVELOPMENT | 2006 |
|
RU2310753C2 |
ROCK PRESSURE CONTROL METHOD | 2010 |
|
RU2454540C1 |
METHOD FOR DEVELOPMENT OF ORE BODIES | 2009 |
|
RU2398109C1 |
METHOD OF EXCAVATING ORE DEPOSITS OF INTER-CHAMBER PILLARS | 0 |
|
SU899960A1 |
METHOD FOR REMOVING PILLARS IN ADJACENT OREBODIES | 0 |
|
SU1652554A1 |
METHOD OF MINING MINERAL DEPOSITS | 0 |
|
SU1709098A1 |
METHOD OF MINING THICK DEPOSITS | 0 |
|
SU1555486A1 |
THICK FLAT DIPPING ORE DEPOSITS AT BIG DEPTHS DEVELOPMENT METHOD | 2015 |
|
RU2607131C1 |
Authors
Dates
2007-09-20—Published
2006-07-03—Filed