FIELD: heat power engineering.
SUBSTANCE: invention can be used at thermoelectric plants. Invention is aimed at increasing power and economy of extraction turbine plant with three-stage heating of system water at cutting off supply of peak-load boiler with turbine extraction steam and after-heating of system water in peak-load hot water boiler. According to invention, diaphragm is removed from holder of intermediate compartment in first pressure stage in direction of steam flow, blades of disk in this stage are removed and roots of blades are fitted-in instead of removed blades.
EFFECT: increased power and economy of extraction turbine plant.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF EXTRACTION TURBINE PLANT | 2006 |
|
RU2311542C1 |
METHOD OF OPERATION OF EXTRACTION TURBINE ACCORDING TO THERMAL SCHEDULE | 1997 |
|
RU2133346C1 |
METHOD OF TWO-STAGE DELIVERY WATER HEATING | 2014 |
|
RU2592008C2 |
SINGLE-CYLINDER EXTRACTION TURBINE FOR COMBINED-CYCLE PLANT | 2011 |
|
RU2490479C2 |
POWER-AND-HEAT SUPPLY INSTALLATION | 0 |
|
SU1089284A1 |
METHOD OF MULTISTAGE HEATING OF EXTRACTION TURBINE PLANT HEATING WATER | 0 |
|
SU1097813A1 |
METHOD OF OPERATION OF POWER AND HEAT GENERATION PLANT | 1994 |
|
RU2079673C1 |
CENTRAL HEATING PLANT | 0 |
|
SU1539341A1 |
STEAM-POWAR PLANT | 0 |
|
SU569734A1 |
STEAM TURBINE UNIT WITH SWITCHABLE LOW-PRESSURE STEAM SUPPLY POINT OF WASTE HEAT BOILER | 2023 |
|
RU2809894C1 |
Authors
Dates
2007-10-10—Published
2005-10-03—Filed