FIELD: methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from multiple-zone well.
SUBSTANCE: system involves polished receiving sockets arranged in casing pipe and fluid medium supply device. Fluid medium supply device comprises at least one sealing unit for selective isolation of chosen well zone and for fluid medium supply in the chosen zone. Gun perforator may be connected to fluid medium supply device to facilitate target well zone perforation, isolation and treatment.
EFFECT: possibility of well zone treatment in single pass along well bore.
27 cl, 19 dwg
Title | Year | Author | Number |
---|---|---|---|
ASSEMBLY AND METHOD FOR FLOW INTENSIFICATION BY HYDRAULIC FRACTURING IN SEVERAL ZONES USING INDEPENDENT UNITS IN PIPE SYSTEMS | 2011 |
|
RU2571460C2 |
MULTI-ZONE COMPLETION WITH FORMATION HYDRAULIC FRACTURING | 2012 |
|
RU2601641C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2658400C1 |
DEVICE FOR AUTOMATIC TOOL RELEASING | 2005 |
|
RU2302509C2 |
METHOD OF ELIMINATING PROPPANT DEPOSITION CONDITIONS DURING WELL COMPLETION | 2015 |
|
RU2664989C1 |
METHOD AND FACILITY FOR CONTROL OVER UNSTABLE STATE IN WELL BOREHOLE | 2003 |
|
RU2352769C2 |
ENERGY TRANSFER MECHANISM FOR CONNECTING NODE OF BOREHOLE | 2017 |
|
RU2761941C2 |
METHOD FOR DISCONNECTING TUBING STRING AT PACKER POLISHED RECEIVING SOCKET AND DOWNHOLE ASSEMBLY FOR SEPARATING THE WELL BORE INTO TUBING STRING SECTIONS | 2019 |
|
RU2804415C1 |
POWER TRANSMISSION MECHANISM FOR A CONNECTING ASSEMBLY OF A WELLBORE | 2017 |
|
RU2752579C1 |
ENERGY TRANSFER MECHANISM FOR THE BOREHOLE CONNECTION ASSEMBLY | 2017 |
|
RU2748567C1 |
Authors
Dates
2007-11-10—Published
2005-12-29—Filed