METHOD FOR OPERATION OF WELL JET PLANT DURING HYDRO-FRACTURING OF MULTI-BED FORMATIONS OF HYDROCARBONS Russian patent published in 2007 - IPC F04F5/02 E21B43/14 E21B43/27 E21B47/12 

Abstract RU 2310103 C1

FIELD: technology for extracting various substances from wells.

SUBSTANCE: in accordance to the method, packer and jet pump are lowered into the well between productive beds, packer is installed between lower and first intermediate formation, hydro-fracturing liquid is forced into lower formation, then drainage of the bed is performed with removal of hydro-fracturing liquid from it together with proppant non-fixed in the bed, recording pressure in the well below the packer by means of autonomous manometer, after that packer is switched to transport position, pipes column with packer and jet pump is lifted and packer is unpacked between next intermediate beds, proppant seal is installed in interval from the face to the shoe of intermediate bed, then operations are repeated, and so on depending on number of productive layers, after that flexible tube is lowered through pipes column and jet pump and well is cleaned of proppant through it, after removal of proppant depression is created on productive beds and by means of geophysical device influx profiles are registered in interval from well face to entrance cone.

EFFECT: increased operational productivity of well jet plant.

5 dwg

Similar patents RU2310103C1

Title Year Author Number
JET WELL PUMP INSTALLATION 2005
  • Khominets Zinovij Dmitrievich
RU2287723C1
WELL FLUID PLANT AND METHOD FOR OPERATION THEREOF 2005
  • Khominets Zinovij Dmitrievich
RU2289042C1
WELL JET DEVICE FOR HORIZONTAL WELLS AND METHOD FOR OPERATING SAID DEVICE 2006
  • Khominets Zinovij Dmitrievich
RU2300671C1
METHOD OF OPERATION OF JET PLANT AT COMPLETION AND OPERATION OF OIL AND GAS WELLS 2006
  • Khominets Zinovij Dmitrievich
RU2307959C1
WELL JET FACILITY FOR HYDRO-BREAK-UP OF RESERVOIR AND RESERCH OF HORIZONTAL WELLS AND METHOD OF THIS FACILITY EMPLOYMENT 2007
  • Khominets Zinovij Dmitrievich
RU2341692C1
OPERATING METHOD OF WELL JET PUMP UNIT DURING HYDRAULIC FRACTURING OF FORMATIONS 2019
  • Karasevich Aleksandr Miroslavovich
  • Khominets Zinovij Dmitrievich
RU2705708C1
METHOD OF OPERATION OF OIL-WELL JET PLANT AT HYDRAULIC FRACTURING OF FORMATION 2002
  • Khominets Zinovij Dmitrievich
  • Pecherkin M.F.
RU2205993C1
METHOD OF AND PLANT FOR OPERATING JET UNIT AT HYDRAULIC FRACTURING OF FORMATION 2004
  • Khominets Zinovij Dmitrievich
RU2263236C1
OIL-WELL JET PLANT FOR HYDRAULIC FRACTURING OF FORMATION 2002
  • Khominets Zinovij Dmitrievich
RU2205992C1
METHOD FOR BOREHOLE JET PLANT OPERATION DURING GAS PRODUCTION FROM GAS-CONDENSATE WELL 2004
  • Khominets Zinovij Dmitrievich
RU2263237C1

RU 2 310 103 C1

Authors

Khominets Zinovij Dmitrievich

Dates

2007-11-10Published

2006-06-16Filed