FIELD: oil production, particularly enhanced recovery methods for obtaining hydrocarbons.
SUBSTANCE: method involves installing plunger sucker-rod pump in well filled with liquid, wherein the pump is connected to remote drive through control rod; creating isolated chambers in well; performing intermittent pressure change in separate chambers as plunger reciprocates; periodically communicating chambers having different liquid pressures with each other after full plunger reciprocation drive unloading as plunger reaches extreme upper position during downward plunger movement under gravity when control rod stress is highly decreased.
EFFECT: increased wave action power due to elimination of impact-and-dynamic equipment load.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR COMPLEX PRODUCTIVE BED TREATMENT | 2006 |
|
RU2321736C1 |
METHOD FOR WAVE PRODUCTIVE BED TREATMENT | 2006 |
|
RU2307924C1 |
METHOD OF PRODUCTIVE STRATA WAVE PROCESSING AND DEVICE FOR ITS FULFILLMENT | 2005 |
|
RU2327034C2 |
WELL DEVELOPMENT METHOD | 1998 |
|
RU2136851C1 |
WELL OPERATION METHOD | 1998 |
|
RU2135746C1 |
METHOD OF OPERATION OF WELL | 2008 |
|
RU2369725C1 |
DEVICE FOR OIL PRODUCTION AND WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2307925C1 |
DEEP-WELL SUCKER-ROD PUMPING UNIT | 2001 |
|
RU2205979C1 |
"=T=+¦¦" 57 BOREHOLE PUMP | 2014 |
|
RU2565956C1 |
HYDRAULIC DRIVE OF SUCKER-ROD PUMP | 2024 |
|
RU2826087C1 |
Authors
Dates
2007-11-20—Published
2005-12-19—Filed