FIELD: mining, particularly mine lining with deep bolts.
SUBSTANCE: method involves drilling borehole; inserting necessary number of ampoules filled with chemical hardening mix in the borehole; inserting sharpened bolt end having length exceeding mine height in borehole and leaving another end in mine ground; locking bolt rod and support washer thereof with the use of sharpened metal bar having length equal to telescopic perforator advancing travel; moving the lock to borehole head by force applied thereto by telescopic perforator; repeating said movement operation to provide perforator connection with bolt head to rotate bolt for ampoule breaking and mixing; retaining bolt in borehole up to total mix polymerization. Borehole drilling and anchor installation are carried out with the use the same telescopic perforator.
EFFECT: increased reliability, decreased costs and time for bolt installation, simplified works due to possibility of integral bolt installation mechanization with the use of device for bolt forcing in borehole.
4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STEEL-AND-POLYMERIC ANCHOR INSTALLATION | 2003 |
|
RU2262599C2 |
STEEL-AND-POLYMERIC DEEP-LEVEL ANCHORING DEVICE | 2004 |
|
RU2258812C1 |
YIELDING ROCK BOLTING | 2014 |
|
RU2542067C1 |
MINE ROOF BOLTING | 2006 |
|
RU2311535C1 |
BOLTING OF MINE WORKINGS | 1999 |
|
RU2172409C2 |
ROOF BOLT LOCKED BY FIRING | 2010 |
|
RU2451182C1 |
METHOD FOR ANCHORAGE OF MINES | 2010 |
|
RU2441165C1 |
DEVICE FOR SETTING ROOF BOLTS | 0 |
|
SU1263873A1 |
MINE ROOF BOLT SETTING APPARATUS | 0 |
|
SU1073468A1 |
PROCESS OF ERECTION OF ROOF BOLTING | 1998 |
|
RU2157454C2 |
Authors
Dates
2007-12-10—Published
2006-03-06—Filed