FIELD: mining industry. SUBSTANCE: process includes simultaneous drilling of rock holes and erection of roof bolting with use of hollow rod with expendable cutting tool at front end, with forms or plate and nut. Then binder with hardening accelerator is fed into space of rod. Rock hole is washed simultaneously with drilling of rock hole and erection of roof bolting, then supply of water is stopped and pumping plant with vessels containing needed resins and binder with hardening accelerator is switched on. Fixing of rod, filling of cracks in rock mass, impregnation of rock mass and application of binder with hardening accelerator on roof and sides of working are carried out at same time. EFFECT: reduced time of support of working with use of roof bolting and binder with hardening accelerator. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
TUNNELING COMPLEX | 1998 |
|
RU2172405C2 |
HEADING SET OF EQUIPMENT | 2012 |
|
RU2498062C1 |
ROOF BOLT LOCKED BY FIRING | 2010 |
|
RU2451182C1 |
ERECTION METHOD OF EARTHQUAKE RESISTANT CONCRETE SUPPORT | 2012 |
|
RU2509893C1 |
METHRD OF SUPPORTING THE ROOF OF MINE WORKINGS | 0 |
|
SU909189A1 |
INJECTOR-ANCHOR FOR FIXING CRACKED ROOF OF MINE WORKINGS | 2023 |
|
RU2802410C1 |
METHOD OF CONSTRUCTING ROOF BOLT SUPPORT | 0 |
|
SU1608351A1 |
TUNNELING COMPLEX | 2000 |
|
RU2184846C2 |
METHOD OF STRENGTHENING ROCK AREA AROUND WORKING | 0 |
|
SU969903A1 |
DEVICE FOR INJECTION OF RESIN FOR DRILLING DEVICE FOR INSTALLATION OF ANCHOR BOLTS IN SOIL | 2012 |
|
RU2600120C2 |
Authors
Dates
2000-10-10—Published
1998-02-04—Filed