HYDRAULIC HAMMER FOR PILE DRIVING Russian patent published in 2007 - IPC E02D7/10 

Abstract RU 2312952 C1

FIELD: construction equipment, particularly for pile driving during foundation erection, particularly to drive tubular marine piles and to remove piles from ground, for marine shelf rock crushing.

SUBSTANCE: hydraulic hammer comprises impact body 7, hydraulic cylinder for impact body acceleration, hydraulic pump 22 for impact mass 7 lifting, hydraulic accumulator 9 for rapid oil discharge from hydraulic cylinder 2 during impact body acceleration, as well as hydraulic distribution means 17 to control oil flows, pressure 18 and discharge 19 hydraulic lines. Hydraulic hammer has cylindrical body 1 and doubled high-pressure gas 5 and low-pressure gas chamber 10 arranged inside the body. Piston cavities of hydraulic cylinder 2 for impact body 7 acceleration and hydraulic accumulator 9 made as hydraulic cylinder are communicated with the chamber. Hydraulic hammer has hydraulic distribution means 17 having electric control member 15. Discharge pipeline 19 is linked to hydraulic pump 22 inlet and is connected with hydraulic accumulator 9 through hydraulic distribution means 17 to open oil flow in hydraulic cylinder 2 by means of hydraulic pump during impact body 7 drop.

EFFECT: increased economical efficiency along with increased impact frequency and possibility to change impact power in wide range.

1 dwg, 2 tbl

Similar patents RU2312952C1

Title Year Author Number
METHOD AND DEVICE FOR PILE DRIVING BY HYDRAULIC HAMMER 2003
  • Tarasov V.N.
  • Bojarkin G.N.
  • Kostjukov V.N.
  • Tarasov E.V.
  • Kovalenko M.V.
RU2233364C1
FLUID OPERATED HAMMER 2012
  • Fomenko Stanislav Grigor'Evich
  • Adamova Ol'Ga Kirillovna
  • Tarasov Aleksej Afanas'Evich
  • Khokhlov Dmitrij Anatol'Evich
  • Nesterov Jurij Aleksandrovich
RU2517290C1
HYDRAULICALLY DRIVEN SLEDGE HAMMER 2012
  • Koshelev Valerij Petrovich
  • Alekseev Valerij Anatol'Evich
RU2505375C1
HYDRAULIC PILE-DRIVING HAMMER 2000
  • Golovachev A.S.
  • Khachikjan Eh.D.
RU2188905C2
METHOD OF PIERCING HOLES IN SOIL AND RELEVANT DEVICE 0
  • Gruzin Vladimir Vasilevich
  • Moiseev Yurij Nikolaevich
  • Ponomarenko Yurij Evgenevich
  • Belyaev Mikhail Alekseevich
  • Erofeev Lev Viktorovich
SU1709054A1
HYDRAULIC PILE HAMMER 0
  • Sokolov Vladimir Andreevich
  • Dmitrevich Yurij Vladimirovich
  • Gavrilov Nikolaj Ivanovich
SU1086071A1
HYDRAULIC HAMMER 2001
  • Kuvshinov V.A.
RU2209879C2
HYDRAULIC PILE DRIVER 0
  • Klyuev Vasilij Grigorevich
  • Dmitrevich Yurij Vladimirovich
  • Vyazovikin Vasilij Nikolaevich
  • Erofeev Lev Viktorovich
  • Zhigalov Vladimir Akindinovich
  • Zobin Aleksandr Yakovlevich
SU1170047A1
HYDRAULIC PILE DRIVER 0
  • Ivanov Mikhail Evgenevich
  • Matveev Igor Borisovich
  • Pedan Vladimir Stepanovich
SU810893A1
IMPACT ACTION DEVICE 2011
  • Fadeev Petr Jakovlevich
  • Fadeev Vladimir Jakovlevich
RU2480587C1

RU 2 312 952 C1

Authors

Levkov Vladimir Alekseevich

Ukhazanov Vjacheslav Afrikanovich

Dates

2007-12-20Published

2006-09-22Filed