FIELD: timber transportation by water, particularly devices for floating structure consolidation.
SUBSTANCE: device comprises horizontal beams spaced apart in vertical direction and arranged in ground and post with cable connected thereto brought into contact with the beams. Upper beam has length LB=(2...3)LH and is located from floating structure side at depth of hB=(0.32...0.42)h, where LH is lower beam length, m; LB - upper beam length, m; h is post deepening distance, m. lower beam is located from opposite post side. Floating structure cable is connected to post.
EFFECT: increased operational reliability due to equal beam loading and possibility of working cable length regulation.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
ANCHORING DEVICE FOR BANK ATTACHMENT OF FLOATING STRUCTURES | 1992 |
|
RU2020205C1 |
RETAINING WALL | 0 |
|
SU1301904A1 |
METHOD FOR JOINING COASTAL AND RIVER PARTS OF FLOATING UNIFIED RAILWAY RIBBON BRIDGE MLZH-VF-VT | 2020 |
|
RU2750370C1 |
DEVICE FOR FLOATING STRUCTURE LANDING AND FASTENING TO ANCHOR POLE | 2006 |
|
RU2304658C1 |
METHOD TO REINFORCE FOUNDATION PIT BOARDS | 2010 |
|
RU2417284C1 |
DEVICE FOR SHORE FASTENING OF FLOATING STRUCTURES | 0 |
|
SU1548321A1 |
FORMATION METHOD OF SMALL-SIZED FLOTATION RAFTS SECTIONS AT MINIROAD | 2015 |
|
RU2618560C1 |
DEVICE FOR SECURING FLOATING STRUCTURES ON A BANK | 0 |
|
SU1523508A1 |
METHOD OF STACKING AND UNSTACKING OF ROUND TIMBER | 1991 |
|
RU2029717C1 |
SUPPORT AND METHOD OF INSTALLATION OF SAME | 0 |
|
SU1644723A3 |
Authors
Dates
2007-12-27—Published
2006-01-10—Filed