FIELD: heat power engineering.
SUBSTANCE: proposed thermal power station has gas-turbine plant, steam boiler to which gas duct of oxidizer-waste gases of gas turbine is connected, and convection steam superheater, water economizer, high-pressure gas-water heater arranged in boiler downtake gas duct, extraction steam turbine plane with heating and regenerative steam extractions, condenser higher-pressure deaerator connected by deaerated feed water pipeline through feed pump with high-pressure gas-water heater of steam boiler. Water-to-water heater installed for heating additional feed water after atmospheric deaerator is connected by heating medium line to pipe for feed water deaerated in higher pressure deaerator before series-connected regenerative low-pressure heater connected to turbine extraction and high pressure gas-water of steam boiler.
EFFECT: increased economy of thermal power station.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
THERMAL POWER STATION | 2005 |
|
RU2309257C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2317426C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2309262C2 |
THERMAL POWER STATION | 2005 |
|
RU2309263C2 |
THERMAL POWER STATION | 2005 |
|
RU2317424C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2317425C2 |
METHOD OF OPERATION OF THERMAL POWER STATION | 2005 |
|
RU2309261C2 |
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT | 2016 |
|
RU2631961C1 |
METHOD OF WORK OF BINARY STEAM HEAT ELECTROCENTRAL | 2016 |
|
RU2626710C1 |
METHOD OF BINARY CCP-THERMAL POWER PLANT | 2015 |
|
RU2600666C1 |
Authors
Dates
2008-02-20—Published
2005-12-02—Filed