METHOD OF WORK OF BINARY STEAM HEAT ELECTROCENTRAL Russian patent published in 2017 - IPC F01K23/10 

Abstract RU 2626710 C1

FIELD: power industry.

SUBSTANCE: outgoing gases are fed to the recovery boiler after the gas turbine plant. The generated heat recovery boiler steam is then fed to expand and do work in the heating steam turbine of the steam withdrawn from which heats the upper and lower network heaters for heating-system water, the remaining part of the steam to a condenser, the condensate from the condensate pump which pumped into the waste heat boiler, exhaust gases after the recovery boiler is heated demineralized makeup water heating system in a gas-water heater, the exhaust gases after which produce additional heat set oh gazosetevom water heater, installed separately from the recovery boiler after the upper heater network. At the same time, steam consumption through the reduction-cooling unit (RCU) is reduced, which is used only for the direction of the reduced steam to the deaerator of the heating system for deaeration of the chemically cleaned make-up water of the heating network, and increase the steam flow into the flowing part of the steam turbine, and also reduce the steam extraction Network heaters and increase the steam flow into the "tail" part of the low-pressure cylinder of the heat-recovery steam turbine.

EFFECT: increasing the electric capacity of the binary combined-cycle plant of a combined heat and power plant.

1 dwg, 2 tbl

Similar patents RU2626710C1

Title Year Author Number
METHOD FOR OPERATION OF BINARY COMBINED CYCLE POWER PLANT 2016
  • Novichkov Sergej Vladimirovich
RU2631961C1
METHOD OF BINARY CCP-THERMAL POWER PLANT 2015
  • Novichkov Sergej Vladimirovich
  • Popova Tatyana Ivanovna
RU2600666C1
MANEUVERED REGENERATIVE STEAM GAS THERMAL POWER PLANT OPERATING METHOD AND DEVICE FOR ITS IMPLEMENTATION 2015
  • Sheludko Leonid Pavlovich
RU2648478C2
OPERATING METHOD OF HOT-WATER BOILER 2019
  • Novichkov Sergej Vladimirovich
  • Rostuntsova Irina Alekseevna
RU2716202C1
POWER SUPPLY UNIT WITH COMPLEX RECYCLING OF OIL AND GAS INDUSTRY WASTES 2018
  • Kulbyakina Aleksandra Viktorovna
  • Ozerov Nikita Alekseevich
RU2713936C1
MULTI-MODE HEAT EXTRACTION PLANT 2009
  • Shelud'Ko Leonid Pavlovich
RU2420664C2
COMBINED-CYCLE COGENERATION PLANT 2017
  • Biryuk Vladimir Vasilevich
  • Kirsanov Yurij Georgievich
  • Livshits Mikhail Yurevich
  • Tsapkova Aleksandra Borisovna
  • Sheludko Leonid Pavlovich
RU2650232C1
THERMOELECTRIC PLANT WITH GAS-TURBINE UNIT 2005
  • Nikishin Viktor Anatol'Evich
  • Peshkov Leonid Ivanovich
  • Ryzhinskij Il'Ja Nakhimovich
  • Shelud'Ko Leonid Pavlovich
RU2280768C1
THERMAL VAPOR INSTALLATION WITH A STEAM TURBINE DRIVE OF A COMPRESSOR 2018
  • Biryuk Vladimir Vasilevich
  • Livshits Mikhail Yurevich
  • Shimanova Aleksandra Borisovna
  • Shimanov Artem Andreevich
  • Sheludko Leonid Pavlovich
  • Anisimov Mikhail Yurevich
  • Korneev Sergej Sergeevich
RU2700320C2
METHOD OF COMBINED-CYCLE POWER PLANT EFFICIENCY INCREASING 2005
  • Kirilenko Viktor Nikolaevich
RU2334112C2

RU 2 626 710 C1

Authors

Novichkov Sergej Vladimirovich

Dates

2017-07-31Published

2016-06-10Filed