FIELD: construction, particularly dangerous structure base reinforcement and slum building rehabilitation.
SUBSTANCE: method in accordance with the first embodiment involves drilling horizontal radial holes under inventory dumb column from well or wells sunk outside outer boundary of dangerous operation zone and projecting 1.0-1.5 meters below foundation base; securing ground by vibratory injection thereof during interval column removal; laying reinforcement bars in holes in horizontal direction and concreting thereof. In the second embodiment horizontal holes are drilled from trench created 1.0-1.5 meters below grillage. The horizontal wells are created between pile rows so that they project outside outer grillage boundary.
EFFECT: increased efficiency of deformed base ground stabilization.
3 cl, 2 dwg, 2 ex
Title | Year | Author | Number |
---|---|---|---|
BUILDING METHOD OF WATERTIGHT SCREEN IN BUILT-UP AREAS | 2007 |
|
RU2349710C1 |
METHOD FOR WATER RESOURCE PROTECTION BY MEANS OF HORIZONTAL (INTERFORMATION) CUTOFFS AND CUTOFF ERECTION TECHNIQUE | 2007 |
|
RU2347034C1 |
METHOD FOR HORIZONTAL DRAINING OF WATERLOGGED STRUCTURES ON PILE FOUNDATIONS | 2012 |
|
RU2539447C2 |
METHOD OF WELL HYDROMINING AT EXCAVATION WITH PRELIMINARY DRYING OF MINERALS | 2011 |
|
RU2499140C2 |
METHOD OF ANTHROPOGENIC EPIGENESIS OF BACKFILLING WATER PERMEABLE AREAS OR ZONES IN SALT ROCK | 2007 |
|
RU2363848C1 |
DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS | 2010 |
|
RU2415228C1 |
METHOD OF PROTECTION OF MINING WORK AGAINST WATER INTRUSION AND POLLUTION OF WATER RESOURCES BY PETROLEUM PRODUCTS IN FRACTURED WATER BEARING FORMATIONS | 2006 |
|
RU2333320C1 |
METHOD AND DEVICE FOR ERECTION OF HORIZONTAL DRAIN HOLE IN WATERED SANDS | 2008 |
|
RU2382866C2 |
PREVENTION METHOD OF LIQUID CONTAMINATIONS FRONTAL ADVANCE IN FORMATION MASSIF | 2007 |
|
RU2365703C1 |
METHOD OF HORIZONTAL RADIAL DRAIN HOLE CONSTRUCTING IN HARD ROCKS | 2007 |
|
RU2337244C1 |
Authors
Dates
2008-03-20—Published
2006-08-14—Filed