FIELD: exploration drilling and hydrocarbon production.
SUBSTANCE: device comprises tubular member with precut window and gate arranged at the window. Gate is covered with release material. Method for tubular member preparation for member lowering in well involves providing tubular member with window, gate adapted to close tubular member window and release material covering at least one gate part facing environment through window; installing tubular member in well; injecting hardening agent in hole annuity created around tubular member.
EFFECT: increased multilateral well construction efficiency.
29 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MULTILATERAL WELL CONSTRUCTION | 2016 |
|
RU2650161C2 |
METHOD OF FORMING A JOINT OF MULTILATERAL WELLS | 2023 |
|
RU2820547C1 |
DEFLECTOR ASSEMBLY WITH A WINDOW FOR A MULTILATERAL BOREHOLE, MULTILATERAL BOREHOLE SYSTEM AND METHOD FOR FORMING A MULTILATERAL BOREHOLE SYSTEM | 2019 |
|
RU2776020C1 |
SYSTEM FOR DRILLING MULTI-BARREL WELLS, WHICH ENABLES TO MINIMIZE NUMBER OF ROUND-TRIP OPERATIONS | 2015 |
|
RU2687729C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS | 2008 |
|
RU2363839C1 |
METHOD FOR PROVIDING FOR CONNECTION BETWEEN SHAFT OR SHAFTS OF SIDE BRANCH WITH BARE MAIN SHAFT OF WELL AND DEVICE FOR REALIZATION OF SAID METHOD, SYSTEM FOR COMPLETING WELL HAVING SIDE BRANCH, METHOD FOR CONNECTING EQUIPMENT OF MAIN SHAFT OF WELL TO EQUIPMENT OF SIDE SHAFT AND DEVICE FOR REALIZATION OF SAID METHOD | 1999 |
|
RU2239041C2 |
TAIL PIPE FOR SIDE HOLE ATTACHMENT | 2013 |
|
RU2539489C2 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
METHOD FOR CONTROLLED CUT-OUT OF OPENING IN CASED WELL SHAFT USING PRESSURE DROP FOR MOVEMENT OF CUTTER | 2011 |
|
RU2552262C1 |
METHOD FOR RECONSTRUCTION OF AN INACTIVE WELL | 2022 |
|
RU2795655C1 |
Authors
Dates
2008-03-20—Published
2003-11-07—Filed