FIELD: oil production, particularly methods or devices for cementing, for plugging holes, crevices, or the like.
SUBSTANCE: method involves creating sand bridge within perforation interval. Sand with 0.6-0.8 mm particle dimensions is used and sand bridge is installed up to level spaced at least 1.5 m over perforation interval. Sand is supplied via production string having lower end arranged in well and spaced 30-35 cm over upper level of sand bridge to be created. Then liquid circulation with flow rate of 1.5-2.0 dm3/s via production string is provided. After that sand in amount of 45-55 kg/m3 is poured in production string. Liquid circulation rate is increased to 2.8-3.4 dm3/s along with sand amount increase up to 90-110 kg/m3 for production strings having diameters of 2.5" and up to 140-160 kg/m3 for production strings of 3" diameters. After calculated amount of sand pouring liquid with volume of not less than one production string volume is injected and technological time-delay is carried out for not less than 4 hours to provide sand subsidence. After than liquid circulation in well is recommenced. Finally upper level of sand bridge is determined.
EFFECT: increased reliability of perforation interval isolation during remedial cementing.
1 cl, 1 ex
| Title | Year | Author | Number | 
|---|---|---|---|
| METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING | 2016 | 
 | RU2622961C1 | 
| METHOD FOR WELL REPAIR | 2008 | 
 | RU2354804C1 | 
| METHOD OF REDUCING WELL REPAIR DURATION WITH INSTALLATION OF THE FLEXIBLE PIPE | 2017 | 
 | RU2670795C9 | 
| ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 | 
 | RU2584256C1 | 
| INSTALLATION METHOD OF BRIDGE CUTTING OFF BELOW-LYING OIL FORMATION | 2012 | 
 | RU2494227C1 | 
| METHOD FOR SAND PLUG EFFLUENT WASHING FROM WELL | 2020 | 
 | RU2739802C1 | 
| METHOD FOR CLEANING A WELL FROM A COMPACTED SAND PLUG | 2021 | 
 | RU2756220C1 | 
| METHOD OF ELIMINATION OF LEAKAGE OF PRODUCING WELL COLUMN | 2007 | 
 | RU2340761C1 | 
| METHOD FOR REMOVAL OF COMPACTED PLUG FROM WELL | 2020 | 
 | RU2736740C1 | 
| WELL REPAIR METHOD | 2012 | 
 | RU2498045C1 | 
Authors
Dates
2008-04-27—Published
2007-05-23—Filed