METHOD OF WELL PRODUCTIVITY IMPROVEMENT (VERSIONS) Russian patent published in 2008 - IPC E21B43/26 

Abstract RU 2324811 C1

FIELD: mining engineering, oil industry.

SUBSTANCE: invention refers to stimulation techniques. It ensures increase of method effectiveness at the cost of prevention crack closure in well critical area and provides reliable connection of fracturing pattern with wellbore both for formations with cracks resulted from hydroseparation and for formations with natural cracks. Method includes well pumping with material expanded in process of hardening or setting. This material is pumped into well critical area equipped with well casings in between well casing and formation with natural cracks or cracks caused by hydroseparation. After that well is being perforated. As a material expanded in process of hardening or setting is used that one having degree of extension high enough to make pressure on well sides and keep at least one crack open.

EFFECT: increase of effectiveness of oil production at the cost of prevention crack closure in well critical area and reliable connection of fracturing pattern with wellbore.

7 cl

Similar patents RU2324811C1

Title Year Author Number
WELL OPERATION STIMULATION 2013
  • Khisamov Rais Salikhovich
  • Taziev Mirgazijan Zakievich
  • Ganiev Bulat Galievich
  • Khusainov Ruslan Fargatovich
  • Garifullin Rustem Maratovich
RU2536524C1
METHOD OF OIL OR GAS FORMATION HYDRAULIC FRACTURING 2019
  • Verisokin Aleksandr Evgenevich
  • Mashkov Viktor Alekseevich
RU2703572C1
METHOD OF FORMING CONDUCTING CRACKS IN PRODUCTIVE FORMATION BEHIND WELL CASING 2015
  • Voldaev Nikolaj Aleksandrovich
RU2601341C1
METHOD FOR IMPROVING HYDRODYNAMIC CONNECTION WITH WELLS PRODUCING FORMATION 2014
  • Panikarovskij Valentin Vasilevich
  • Panikarovskij Evgenij Valentinovich
  • Panikarovskij Vasilij Valentinovich
  • Sagidullin Maksim Aleksandrovich
RU2580531C2
METHOD FOR CONSOLIDATING OF INCOMPETENT FORMATION 2014
  • Dolgov Sergej Viktorovich
  • Zhikhor Pavel Sergeevich
RU2558080C1
WELL OPERATION INTENSIFICATION METHOD 2013
  • Khisamov Rais Salikhovich
  • Rakhmanov Ajrat Rafkatovich
  • Ganiev Bulat Galievich
  • Khusainov Ruslan Fargatovich
  • Garifullin Rustem Maratovich
RU2527917C1
WELL OPERATION INTENSIFICATION METHOD 2012
  • Khisamov Rais Salikhovich
  • Taziev Mirgazijan Zakievich
  • Ganiev Bulat Galievich
  • Khusainov Ruslan Fargatovich
  • Khamatshin Farit Akhatovich
RU2494243C1
PROCESS OF HYDRAULIC FRACTURING OF FORMATIONS IN WELLS 2000
  • Ivannikov V.I.
RU2219335C2
WATER PRODUCTION METHOD 2004
  • Podobed Viktor Sergeevich
  • Martynov Evgenij Jakovlevich
  • Mazaev Vladimir Vladimirovich
RU2273730C1
METHOD FOR FORMATION HYDRAULIC FRACTURING IN HORIZONTAL OPEN WELL SHAFT 2014
  • Rakhmanov Rafkat Mazitovich
  • Ismagilov Fanzat Zavdatovich
  • Garifov Kamil' Mansurovich
  • Salimov Oleg Vjacheslavovich
  • Zijatdinov Radik Zjauzjatovich
RU2541693C1

RU 2 324 811 C1

Authors

T'Erselin Mark

Dates

2008-05-20Published

2006-09-22Filed