FIELD: oil and gas industry.
SUBSTANCE: invention is referred to engineering and technology of simultaneous bleeding of products from one formation and fluid injection in other formation of a hole. It provides simplification of installation, efficiency upgrading of pump operation and expansion of functionality due to simultaneous bleeding of products from one formation and fluid injection in other formation of a hole. Essence of the invention: device contains a pipe string with the packer installed between pointed formations, and also the pump. The pump is executed plunger and is installed concentrically as a part of a pipe string. The pump consists of the cylinder piston with end-to-end longitudinal channels and the flap, thus the cylinder piston is rigidly connected with a rod string. The packer is executed in the form of the resilient sleeve gasket which is drawn in from below by a perforated liner at its bearing on a bottom-hole which is put outside telescopically on a bottom of a pipe string with possibility of the bounded movement upwards. The bottom is executed in the form of a hollow landing seat screwed on a pipe string down hole end. The room of a pipe string below a ram pump is directly connected with the bottom formation through openings of a perforated liner and annulus room of a pipe string below a packer. The annulus room of a pipe string above a packer is connected with an upper formation.
EFFECT: installation simplification of products bleeding from one formation and fluid injection in other formation of a hole and efficiency upgrading of pump operation and expansion of functionality.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR LIQUID INJECTION IN ONE WELL RESERVOIR AND OIL PRODUCTION FROM ANOTHER ONE | 2006 |
|
RU2323329C1 |
DEVICE FOR INJECTION OF FLUID FROM BOTTOM WATER PRODUCING FORMATION OF HOLE IN UPPER PETROLIFEROUS FORMATION | 2006 |
|
RU2325512C1 |
DEVICE FOR LIQUID INJECTION FROM UPPER WATER-BEARING WELL RESERVOIR INTO LOWER OIL-BERING RESERVOIR | 2006 |
|
RU2321730C1 |
DEVICE FOR FLUID INJECTION IN BOTTOM FORMATION AND OIL EXTRACTIONS FROM UPPER FORMATION | 2006 |
|
RU2325513C1 |
DEVICE FOR LIQUID INJECTION FROM UPPER WATER-BEARING WELL RESERVOIR INTO LOWER OIL-BERING RESERVOIR | 2006 |
|
RU2321729C1 |
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION | 2023 |
|
RU2819182C1 |
METHOD FOR INTENSIFYING THE PRODUCTION OF RESERVOIR PRODUCTS WITH BOTTOM WATER (OPTIONS) | 2021 |
|
RU2769027C1 |
DEVICE FOR SIMULTANEOUS SEPARATE EXTRACTION OF WELL PRODUCT AND FOR FORCING WATER INTO FORMATION | 2006 |
|
RU2297521C1 |
WELL PUMPING PLANT FOR INJECTION OF FORMATION WATER INTO OIL-BEARING FORMATION | 2000 |
|
RU2162964C1 |
OIL-WELL SUCKER-ROD PUMPING UNIT FOR WATER PUMPING TO STRATUM | 2012 |
|
RU2498058C1 |
Authors
Dates
2008-05-27—Published
2006-11-07—Filed