METHOD FOR INTENSIFYING THE PRODUCTION OF RESERVOIR PRODUCTS WITH BOTTOM WATER (OPTIONS) Russian patent published in 2022 - IPC E21B43/16 

Abstract RU 2769027 C1

FIELD: intensifying methods.

SUBSTANCE: invention relates to methods for intensifying the production of formation products with bottom water. The method for intensifying the production of formation production with bottom water includes the construction of a well with casing string cementing. Conduct a secondary opening of the casing against the productive zone in the upper part, followed by determination of reservoir pressures. An opening of the lower part is carried out opposite the aquifer of the formation. The perforation intervals of the productive and aquifer zones are separated by installing a packer in the production string. The tubing strings are lowered with a pump located above the packer. An additional string of pipes is lowered until its lower part is hermetically fixed in the packer. Formation fluids inflow is called and oil is produced by a pump through a column of lift pipes from a well at drawdown on the productive zone of the formation. Process fluid is pumped into the aquifer through an additional pipe string. A well in a productive formation is built inclined, descending to the bottom, with a zenith angle of the well, providing a distance between openings in the upper and lower parts, which excludes the flow of process fluid between them. As a process fluid, a displacing agent is chosen that is chemically neutral to water and formation products, which eliminates formation clogging. The volume of the displacing agent and the modes of its injection are determined from the condition of maintaining reservoir pressure, which ensures maximum oil recovery from the reservoir.

EFFECT: intensification of production of bottom water reservoir products, including reservoirs with thicknesses less than 50 meters.

3 cl, 2 dwg

Similar patents RU2769027C1

Title Year Author Number
OPERATING METHOD OF WATER-FLOODED OIL FORMATION 2020
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
  • Emelianov Vitalii Vladimirovich
RU2724715C1
METHOD FOR DEVELOPMENT OF FORMATION WITH BOTTOM WATER 2020
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
  • Minikhairov Lenar Ilfatovich
RU2738146C1
METHOD FOR RESTRICTION OF BRINE WATER INFLOW TO PRODUCTION WELL 2011
  • Khisamov Rais Salikhovich
  • Abdrakhmanov Gabdrashit Sultanovich
  • Nuriev Il'Jas Akhmatgalievich
  • Taipova Venera Asgatovna
  • Chepik Sergej Konstantinovich
RU2451165C1
METHOD FOR ISOLATING WATER INFLOW IN A FORMATION WITH BOTTOM WATER 2021
  • Nazimov Nafis Anasovich
RU2775120C1
THE METHOD FOR PUMPING BINARY MIXTURES INTO THE RESERVOIR 2021
  • Nazimov Nafis Anasovich
  • Nazimov Timur Nafisovich
RU2784138C1
METHOD FOR DEVELOPMENT OF OIL DEPOSITS WITH LARGE DEPTHS OF PRODUCTIVE HORIZONS AND LOW WELL YIELDS 2019
  • Kovalev Adolf Appolonovich
RU2713547C1
METHOD OF LIMITATION OF PRODUCED WATER INFLOW TO PRODUCTION WELL 2016
  • Abdrakhmanov Gabdrashit Sultanovich
  • Khisamov Rais Salikhovich
  • Kadyrov Ramzis Rakhimovich
  • Khannanov Mars Talgatovich
  • Khasanova Dilbarkhon Kelamedinovna
RU2620670C1
METHOD FOR PUMPING WATER FROM THE LOWER LAYER TO THE UPPER ONE 2021
  • Nazimov Nafis Anasovich
RU2774445C1
METHOD OF DEVELOPING OIL POOL 0
  • Diyashev Rasim Nagimovich
  • Mazitov Kamil Gassamutdinovich
  • Rudakov Anatolij Moiseevich
  • Zajnullin Nail Gabidullovich
  • Zajtsev Valerij Ivanovich
  • Musabirova Nuriya Khusainovna
SU1627673A1
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT 2017
  • Leontev Dmitrij Sergeevich
  • Kleshchenko Ivan Ivanovich
  • Leonteva Natalya Alekseevna
  • Ponomarev Andrej Aleksandrovich
  • Aleksandrov Vadim Mikhajlovich
RU2661935C1

RU 2 769 027 C1

Authors

Nazimov Nafis Anasovich

Nazimov Timur Nafisovich

Dates

2022-03-28Published

2021-10-28Filed