FIELD: mining industry.
SUBSTANCE: said geotechnological complex for gold dredging and placer mining incorporates a module for preliminary disintegration and hydroerosion of rock in the face with guiding shields, a disintegrating module located below the level of grooved trench for rock hydraulic transportation, a processing complex with hydrotransportation systems and waste dumping system. The disintegrating module has a chute located inside the closed loop of trench for disintegrated rock accumulation. The chute is directed along the rock inflow for rock hydrotransportation and is sloped in the direction of waste dumping. Along the chute and over it, a rigidly supported trestle is installed. The trestle is provided with a bucket driven along the cross beam for rock disintegration. On both sides of the chute, at an angle, transverse flaring chutes with rigidly wall-mounted disintegrators are installed.
EFFECT: improved efficiency of mining due to intensification of disintegration of rock with complex physical and mechanical properties during dredging and placer mining.
6 dwg
Title | Year | Author | Number |
---|---|---|---|
GEOTECHNOLOGICAL COMPLEX FOR GOLD DREDGING AND PLACER MINING | 2006 |
|
RU2325530C1 |
GEOTECHNOLOGICAL COMPLEX FOR GOLD DREDGING AND PLACER MINING | 2006 |
|
RU2325533C1 |
GEOTECHNOLOGICAL COMPLEX FOR GOLD DREDGING AND PLACER MINING | 2006 |
|
RU2325531C1 |
EXCAVATION METHOD OF ALLUVIAL DEPOSITS AND TECHNOLOGICAL COMPLEX FOR ITS FULFILLMENT | 2006 |
|
RU2327039C1 |
GEO-TECHNOLOGICAL COMPLEX WITH AERO-HYDRODYNAMIC ACTIVATION | 2007 |
|
RU2343005C1 |
GEO-TECHNOLOGICAL COMPLEX AT MULTI-STAGE DISINTEGRATION | 2002 |
|
RU2206403C1 |
GEOTECHNOLOGICAL COMPLEX WITH MULTISTAGE DISINTEGRATION | 2002 |
|
RU2209974C1 |
GEOTECHNOLOGICAL COMPLEX AT MULTI-STAGE DISINTEGRATION | 2002 |
|
RU2209678C1 |
GEO-TECHNOLOGICAL COMPLEX WITH HYDRODYNAMIC AND LASER INITIATION | 2007 |
|
RU2343004C1 |
CLAY MINERAL DEPOSITS DEVELOPMENT METHOD | 2013 |
|
RU2537460C1 |
Authors
Dates
2008-05-27—Published
2006-12-25—Filed