FIELD: petroleum industry.
SUBSTANCE: invention is referred to the method of hydrocarbon production from tar sand or reservoir of heavy oil challenged by high viscosity. The method contains drilling and pre-commissioning with casing injecting wells with horizontal bores and producing wells with horizontal bores to the reservoirs below level of the injecting well and creation of permeable zone between injecting and producing wells. Injecting and producing wells are drilled by one of the grid systems with certain space between the wells. After the casing is completed but before horizontal bores are developed, injecting and producing wells shall be deepened to estimated depth. Then whipstock shall be run in each well till tags the bottom in order to direct its discharge channels to the open well section developed after deepening and successively form required number of horizontal bores via each open well section. After that, heat-insulated tubing string shall be run in each well and packer shall be set above perforated section in order to isolate annulus between casing and heat-insulated tubing string to prevent thermal influence to the well above the packer.
EFFECT: higher accuracy of orientating horizontal bores in the reservoir, development efficiency due to larger covered cross-sectional area of the reservoir and simpler method.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXTRACTION OF HEAVY AND HIGH VISCOUS HYDROCARBONS OUT OF UNDERGROUND DEPOSIT | 2006 |
|
RU2330949C2 |
METHOD OF EXTRACTION OF HEAVY AND HIGH VISCOUS HYDROCARBONS FROM UNDEGROUND DEPOSITS | 2007 |
|
RU2339807C1 |
METHOD FOR EXTRACTION OF HEAVY AND HIGH VISCOUS HYDROCARBONS OUT OF UNDERGROUND DEPOSIT | 2007 |
|
RU2339808C1 |
METHOD TO PRODUCE HEAVY AND/OR HIGHLY-VISCOUS HYDROCARBONS FROM UNDERGROUND FIELD | 2006 |
|
RU2321735C1 |
METHOD FOR HEAVY AND HIGHLY-VISCOUS HYDROCARBON PRODUCTION FROM UNDERGROUND DEPOSIT | 2006 |
|
RU2322574C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL RESERVES | 2010 |
|
RU2442883C1 |
PROCEDURE FOR DEVELOPMENT OF BITUMEN DEPOSITS | 2008 |
|
RU2363838C1 |
METHOD FOR HEAVY AND HIGHLY-VISCOUS HYDROCARBON PRODUCTION FROM UNDERGROUND DEPOSIT | 2006 |
|
RU2322577C1 |
PROCEDURE FOR DEVELOPMENT OF HIGH VISCOUS OIL DEPOSITS | 2008 |
|
RU2363839C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSITS | 2008 |
|
RU2398104C2 |
Authors
Dates
2008-08-20—Published
2006-10-16—Filed