FIELD: mining.
SUBSTANCE: device includes loading ramp with ramp surface oriented mainly across outfeed conveyor transportation direction and tilted against it, raised ramp end being positioned under discharge funnel and lowered one forming an outlet to the outfeed conveyor. Behind the loading ramp an auxiliary drift mainly parallel to the entry is located, the said auxiliary drift providing access to the loading ramp from behind.
EFFECT: simplified device assembly and possibility of regular maintenance and repair.
11 cl, 19 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING OPERATIONS AT UNDERGROUND ENTERPRISES BY MEANS OF MINING WITH CAVING | 2006 |
|
RU2376477C1 |
METHOD FOR MINING OF STEEPLY DIPPING ORE BODIES AND METHODS FOR MINING, PROCESSING AND CONCENTRATION OF COPPER, AND/OR COPPER-ZINC, AND/OR ZINC, AND/OR SULFUR ORES WITH POSSIBLE CONTENT OF GOLD, SILVER AND OTHER PRECIOUS AND RARE-EARTH ELEMENTS FROM STEEPLY DIPPING ORE BODIES | 1995 |
|
RU2053364C1 |
METHOD FOR EXPLOITATION OF STEEPLY DIPPING ORE BODIES AND METHODS FOR MINING, PROCESSING AND BENEFICIATION OF COPPER AND/OR COPPER/ZINC, AND/OR ZINC, AND/OR SULFUR ORES POSSIBLY CONTAINING GOLD, SILVER AND OTHER PRECIOUS AND RARE-EARTH ELEMENTS OF STEEPLY DIPPING ORE BODIES | 1995 |
|
RU2065053C1 |
METHOD OF UNDERGROUND MINING OF STEEPLY DIPPING VEIN DEPOSITS | 2001 |
|
RU2193660C1 |
PROCESS DIAGRAM OF EXTRACTION SECTION OF UNDERGROUND SAFE DEVELOPMENT OF HIGH-GAS-BEARING FORMATION | 2018 |
|
RU2735072C2 |
METHOD FOR EXTRACTING STEEP-FALLING ORE DEPOSITS OF LOW AND AVERAGE THICKNESS USING A SUB-LEVEL COLLAPSING SYSTEM WITH FLEXIBLE SEPARATING OVERLAYS | 2004 |
|
RU2301334C2 |
METHOD OF MINING SLOPING ORE BODIES | 0 |
|
SU1633127A1 |
METHOD OF PREPARING THE BOTTOM OF A BLOCK | 0 |
|
SU817262A1 |
METHOD FOR EXTRACTION OF STEEPLY DIPPING ORE BODIES | 2003 |
|
RU2236591C1 |
METHOD OF MINING PARALLEL-CONTIGUOUS DEPOSITS | 0 |
|
SU1709094A1 |
Authors
Dates
2008-09-20—Published
2004-06-18—Filed