FIELD: mining.
SUBSTANCE: method includes lowering casing pipe into well, bottom hole flushing, pumping of spacer fluid and grouting mortar into casing pipe, pressing them through casing string-borehole annulus, placement of grouting mortar in casing string-borehole annulus and leaving it for waiting-on-cement-time. After pressing through spacer fluid in casing string-borehole annulus is "down-up" reciprocated one or more times, alternately pressing all or part of fluid out of the casing string-borehole annulus into the casing pipe and back at various heights and at various speed; simultaneously grouting mortar is reciprocated in a column or its headed portion is pressed through into the casing string-borehole annulus and is reciprocated together with spacer fluid; after reciprocating completion spacer fluid is pressed through into the casing string-borehole annulus.
EFFECT: upgraded quality of wells cementing.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELLS CEMENTING | 2006 |
|
RU2330935C2 |
WELL-CEMENTING PROCESS | 0 |
|
SU1134700A1 |
METHOD OF CEMENTING CASING STRING | 2015 |
|
RU2605856C1 |
WELL CEMENTING METHOD | 2022 |
|
RU2797167C1 |
WELL CASING METHOD IN COMPLICATED CONDITIONS AND DEVICE FOR ITS IMPLEMENTATION | 2022 |
|
RU2781458C1 |
METHOD OF GROUTING OF CASING STRINGS IN WELLS | 0 |
|
SU1776295A3 |
PROCESS OF PRESSURE GROUTING OF WELL | 2000 |
|
RU2183253C2 |
METHOD OF CEMENTING WELLS IN PERENNIALLY FROZEN ROCK ZONES | 0 |
|
SU1763059A1 |
METHOD FOR CEMENTING A FIBERGLASS CASING STRING (OPTIONS) | 2022 |
|
RU2777252C1 |
METHOD FOR STRING CEMENTING IN WELL USING CEMENT MORTAR WITH EROSION PROPERTIES | 2009 |
|
RU2398095C1 |
Authors
Dates
2008-10-10—Published
2006-08-24—Filed