FIELD: mining.
SUBSTANCE: invention concerns mining, particularly a method of cementing of oil, gas and water wells. The method involves landing of a casing pipe into a well, pumping cement slurry into the casing pipe, flush, displacement of the cement slurry to casing annulus and letting it solidify. During flush the cement slurry column in the casing annulus is reciprocated up and down multiple times, ceasing flush for that, further the pressure above bypass plug in the casing pipe is reduced, cement slurry is partially let back into the casing pipe and flushed to the casing annulus again. Reciprocation cycle for the cement slurry column in the casing annulus is repeated multiple times and finished with flush of all cement slurry into the casing annulus. Cement column reciprocation is implemented at various height and speed; before the beginning of the cement slurry gelling the reciprocation height and speed is minimised, while the slurry is flushed into the casing annulus completely before it begins gelling.
EFFECT: improved cementing quality due to the cement slurry reciprocation in casing annulus during a casing pipe cementation, removal of boring fluid residues from the well, casing pipes and cavities walls, elimination of shrinkage strain of solidifying cement grout, reduction of time passing since cement slurry halts till it begins to solidify in the hole clearance.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CEMENTING OF WELLS | 2006 |
|
RU2335618C2 |
WELL CEMENTING METHOD | 2022 |
|
RU2797167C1 |
METHOD FOR CEMENTING A FIBERGLASS CASING STRING (OPTIONS) | 2022 |
|
RU2777252C1 |
METHOD OF CEMENTING CASING PIPE OF GAS WELL UNDER CONDITIONS OF PERMAFROST ROCKS | 2006 |
|
RU2342517C2 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
WELL-CEMENTING PROCESS | 0 |
|
SU1134700A1 |
METHOD FOR WELL CEMENTATION | 1992 |
|
RU2023137C1 |
CASING PIPE VALVE | 2005 |
|
RU2299310C2 |
METHOD FOR CEMENTING THE CONDUCTOR, A TECHNICAL COLUMN DURING THE CONSTRUCTION OF WELLS | 2022 |
|
RU2792128C1 |
METHOD FOR REVERSE CASING CEMENTING | 0 |
|
SU1749445A1 |
Authors
Dates
2008-08-10—Published
2006-07-17—Filed