FIELD: oil and gas industry.
SUBSTANCE: invention refers to oil and gas industry and can be used at operation of multibed wells both for separate and simultaneous development. Method includes selected development of producing beds by means of installation of receiving valves in the structure of a sleeve; the valves are installed in operating columns against each of producing bed; each valve has two steady positions: "closed" and "opened". According to the invention the receiving valves are installed on a case, located in operational column, and they bypass well liquid only in the bottom-up direction. At that, transition of receiving valves into one of the steady positions "opened" or "closed" is achieved by means of a nipple, installed inside the case and plugged from the bottom; the said nipple also has side apertures and gates. The side apertures of the nipple are arranged against the receiving valves, which ought to be set into "opened" position, while the gates are pressure tight installed against the receiving valves, which ought to be set into "closed" position.
EFFECT: reduction of well operation costs.
3 dwg
Title | Year | Author | Number |
---|---|---|---|
FACILITY FOR SIMULTANEOUS-SEPARATE OPERATION OF MULTI-HORIZON WELL | 2007 |
|
RU2339797C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
DEVICE FOR SIMULTANEOUS-SEPARATE OPERATION OF MULTYPAY WELL | 2007 |
|
RU2334866C1 |
DEVICE FOR DEVELOPING A MULTIPLE-ZONE WELL | 2016 |
|
RU2644806C1 |
FACILITY FOR SIMULTANEOUS-SEPARATE OPERATION OF MULTI-HORIZON WELL | 2007 |
|
RU2339796C1 |
METHOD OF CONCURRENT-SEPARATE OPERATION OF MULTIPLE-ZONE WELL AND ADMISSION VALVE FOR PERIODIC SHUTTING OFF FLOW FROM FORMATIONS | 1998 |
|
RU2161698C2 |
METHOD FOR SIMULTANEOUS SEPARATE PRODUCTION OF OIL FROM TWO FORMATIONS OF ONE WELL BY PRODUCTION STRING | 2020 |
|
RU2738615C1 |
METHOD OF GARIPOV'S WELL OPERATION AND DEVICE FOR ITS REALISATION (VERSIONS) | 2008 |
|
RU2398100C2 |
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF SEVERAL PAYOUT BEDS AND INSTALLATION OF WELL FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2334867C1 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
Authors
Dates
2008-11-10—Published
2007-02-26—Filed