METHOD FOR SIMULTANEOUS SEPARATE PRODUCTION OF OIL FROM TWO FORMATIONS OF ONE WELL BY PRODUCTION STRING Russian patent published in 2020 - IPC E21B43/14 

Abstract RU 2738615 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil production, namely to methods of simultaneous separate production of oil from multilayer well by production string, which excludes oil flows between inhomogeneous formations in well, which ensures elimination of effect on downhole and reservoir characteristics of each productive formation, and can be used both in low-yield and high-yield wells. Method includes assembly of deep-pumping unit comprising a sucker-rod pump consisting of a cylinder, a receiving valve, plunger with a pressure valve, connected to the rod string with centralizers, packer made in the form of self-sealing cups, bypass device, hollow shank and stop, lowering assembly into well, landing of packer and testing of packer for tightness, installation of wellhead equipment, selection of well products. Prior to assemble assembly, formation productive beds are determined, reservoir characteristics of productive formations, formation and bottomhole pressure, flow rate of each formation, mark of position of artificial bottomhole along vertical line and borehole, mean zenith angle of well shaft. Performing perforation of production string in interval of productive formations, upper end of pump cylinder is connected to additional branch pipe, on upper part of additional branch pipe additional collar packer is arranged. If the bottomhole pressure of the upper productive formation is higher than that of the bottom one, the cylinder is made with a side suction valve installed in the pump cylinder in the interval dividing the pump cylinder along the length in proportion to the productive beds productive rates. Shank is assembled consisting of branch pipes and slotted filter, as a stop a plug is used. Prior to descending of subsurface pump unit, well borehole is filled with process fluid with definite density. Top second additional branch pipe upper end is connected with setting hydraulic tool and deep-pump plant is lowered into the well to well bottom with immersion of packers for static well liquid level. Packer with self-sealing cuffs is arranged between productive formations, and additional packer is arranged above upper reservoir, distance between packers is not less than 150 m. Slit-type filter is placed in the interval of the lower payout bed. Pump is arranged in roof interval of upper reservoir. Hydraulic setting tool is withdrawn from the well. Plunger of simultaneous separate extraction pump is lowered on rod string to pump cylinder. Product extraction from two formations is performed by production string at wellhead.

EFFECT: increased efficiency of production of heterogeneous productive formations of multilayer deposits at simultaneous separate operation of two and more formations with production lifting by production string, reduction of forces required for descent and lifting of deep pump unit, exclusion of emergency situations, increased reliability of method at production in low-yield and high-yield wells, expansion of technological capabilities, simplification of method.

1 cl, 1 dwg

Similar patents RU2738615C1

Title Year Author Number
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD 2014
  • Zhuravlev Oleg Nikolaevich
  • Nukhaev Marat Tokhtarovich
  • Shchelushkin Roman Viktorovich
RU2594235C2
METHOD OF SIMULTANEOUS SEPARATE OR SUCCESSIVE PRODUCTION OF RESERVOIR FLUID FROM WELL OF MULTIPAY FIELDS WITH PRELIMINARY INSTALLATION OF PACKERS 2014
  • Malykhin Igor' Aleksandrovich
RU2552555C1
UNIT FOR SIMULTANEOUS SEPARATE PRODUCTION AND INJECTION UNDER CONDITIONS COMPLICATED BY HIGH VISCOSITY OF PRODUCT OF UPPER FORMATION 2023
  • Belov Aleksandr Evgenevich
RU2819182C1
PACKER SEPARATION DEVICE FOR WELL RESERVOIR OPERATION (VARIANTS) 2004
  • Sharifov Makhir Zafar Ogly
  • Leonov Vasilij Aleksandrovich
  • Musaverov Rinat Khadeevich
  • Nabiev Adil Dakhil Ogly
  • Ibadov Gakhir Gusejn Ogly
  • Kuznetsov Nikolaj Nikolaevich
  • Sineva Julija Nikolaevna
RU2305170C2
BOREHOLE PUMPING UNIT FOR TWO RESERVOIRS SIMULTANEOUSE PRODUCTION 2008
  • Parijchuk Nikolaj Ivanovich
RU2381352C1
UNIT FOR SIMULTANEOUS SEPARATE OIL PRODUCTION BY WELL WITH LATERAL INCLINED SHAFT 2019
  • Nikolaev Oleg Sergeevich
RU2702180C1
BOREHOLE PLANT FOR SIMULTANEOUS SEPARATE AND ALTERNATE OPERATION OF SEVERAL FORMATIONS BY SINGLE WELL 2003
  • Sharifov Makhir Zafar Ogly
  • Leonov V.A.
  • Uzhakov V.V.
  • Krasnoperov V.T.
  • Kuznetsov N.N.
  • Garipov O.M.
  • Gurbanov Sejfulla Ramiz Ogly
  • Nabiev Natig Adil Ogly
  • Nabiev Fizuli Ashraf Ogly
  • Sineva Ju.N.
  • Jusupov R.F.
RU2262586C2
PRODUCING RESERVOIRS SURVEY METHOD AT DUAL OPERATION OF MULTI-PAY WELL AND INSTALLATION FOR ITS IMPLEMENTATION 2014
  • Nagumanov Marat Mirsatovich
  • Kamil'Janov Timerbaj Sabir'Janovich
  • Shamilov Faat Takhirovich
  • Tokmakov Nikolaj Fedorovich
  • Glavatskikh Jurij Sergeevich
  • Fedorov Roman Aleksandrovich
  • Rjazanov Aleksandr Vladimirovich
  • Kuznetsov Aleksej Vladimirovich
RU2546218C1
METHOD OF SIMULTANEOUS-SEPARATE OPERATION OF DUALLY-COMPLETED WELL AND WELL PUMP UNIT FOR ITS IMPLEMENTATION 2014
  • Nikolaev Oleg Sergeevich
RU2562641C2
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL 2005
  • Kljushin Ivan Jakovlevich
  • Kljushin Aleksandr Ivanovich
RU2293214C2

RU 2 738 615 C1

Authors

Ivanov Vladimir Aleksandrovich

Dates

2020-12-14Published

2020-07-13Filed