FIELD: construction.
SUBSTANCE: prestressed plate for disks of ceilings includes prestressed and nonprestressed reinforcement, and also relieving hollows that are parallel to the long side of plate. At that hollows are located in the top three quarters of plate thickness, and in bottom quarter of plate thickness channels of round section or grooves of parabolic section are additionally arranged for stressing of reinforcement, which are oriented perpendicular to relieving hollows and installed parallel to the smaller side of plate and each other. Symmetry centers of channels are located in one plane in the middle of plate bottom quarter height, and axes of parabolic grooves - perpendicular to the bottom surface of bottom surface of plate.
EFFECT: arrangement of ceiling disks, large-span layers, different platforms from packets of prestressed multi-hollow plates.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDINGS AND STRUCTURES CEILINGS INSTALLATION | 2007 |
|
RU2338856C1 |
REINFORCED CONCRETE PLATE OF ASSEMBLED ROAD CARPET | 2007 |
|
RU2371536C2 |
PRESTRESSED REINFORCED CONCRETE SLAB FOR RAILWAY ROADS | 2007 |
|
RU2373317C2 |
METHOD OF MULTISTOREY BUILDING CARCASSING | 2007 |
|
RU2338843C1 |
TENDON | 2007 |
|
RU2352737C2 |
TUBULAR BUILDING CONSTRUCTION | 2007 |
|
RU2342501C1 |
DESIGN OF TRACK SUPERSTRUCTURE OF BIKBAU UNDERGROUND | 2013 |
|
RU2535806C2 |
CONSTRUCTION METHOD AND DESIGN OF OVERPASSES AND BRIDGES UNDER CONDITIONS OF PERMAFROST | 2012 |
|
RU2513574C2 |
BUILDING METHOD AND PREFABRICATED PAVEMENT STRUCTURE | 2007 |
|
RU2379406C2 |
METHOD OF ROAD CONSTRUCTION ON SOFT AND FROZEN GROUNDS AND ASSEMBLED COAT FOR ITS REALISATION | 2008 |
|
RU2371537C2 |
Authors
Dates
2008-11-20—Published
2007-04-05—Filed