FIELD: construction.
SUBSTANCE: method includes installation of foundation supports, assembly of supporting columns, bearing girders, installation of reinforced concrete ceiling plates, location of prestressed reinforcement and its anchoring. At that for manufacture of supporting columns steel tubes are used that are one - three storeys high, which are vertically installed and fixed: the bottom part - in foundation supports, the top part - in joint assemblies of interfloor ceiling, and further - between joint assemblies of every floor with fastening of bearing girders on side surface of joint assembly and concreting of tube internal volume to the level below joint assembly. Then in plane of floor ceiling reinforced concrete plates are installed on mounting tables between bearing girders with transverse channels, with further pulling of reinforcing cables through the channels, their tensioning, anchoring and concrete monolithing of steel tubes for the remaining height, after that auxiliary assembly devices are dismantled.
EFFECT: reduction of time spent for building carcassing, reduction of metal and concrete consumption, increase of operational characteristics of multistorey building carcass.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
TALL BUILDING | 2007 |
|
RU2350717C1 |
TUBULAR BUILDING CONSTRUCTION | 2007 |
|
RU2342501C1 |
METHOD OF BUILDINGS AND STRUCTURES CEILINGS INSTALLATION | 2007 |
|
RU2338856C1 |
LOW BUILDING | 2005 |
|
RU2295010C2 |
TUBULAR BUILDING STRUCTURE | 2012 |
|
RU2496949C2 |
PRESTRESSED HOLLOW-CORE REINFORCED CONCRETE SLAB FOR CEILING DISKS | 2007 |
|
RU2338851C1 |
METHOD FOR THREE-LAYERED SUSPENDED PANEL PRODUCTION | 2005 |
|
RU2285094C1 |
REINFORCED CONCRETE PLATE OF ASSEMBLED ROAD CARPET | 2007 |
|
RU2371536C2 |
BUILDING METHOD AND PREFABRICATED PAVEMENT STRUCTURE | 2007 |
|
RU2379406C2 |
DEVICE TO EVACUATE PEOPLE FROM HIGH BLOCKS IN FIRE | 2007 |
|
RU2381982C2 |
Authors
Dates
2008-11-20—Published
2007-04-05—Filed